JaxKOMP-EAP raw data: learn_slope_rota            

MPD and LIMS short name learn_slope_rota       learning_slope
Phenotype description learning slope on accelerating rotarod (4-40 rpm/5 min) over 5 trials
MPD and LIMS phenotype procedure rotarod       rotarod       View protocol
MPD measure ID, data type 100594     numeric data
Number of genotypes 557  genotypes completed with analytics available, both sexes
Age at testing 11wks       Early Adult Phenotyping study   EAP
Observations Number recorded: 10570       Number missing: 12  
Phenotyping conducted2012-06-21   thru   2016-05-20


  Raw phenotype values over time

Factors
Displayed Date Range From:    To:
Plot Options
Created with Highcharts 6.0.7Chart context menuFemale (KOMP)Male (KOMP)Female (C57BL/6NJ)Male (C57BL/6NJ)Dec-21-15Jan-04-16Jan-18-16Feb-01-16Feb-15-16Feb-29-16Mar-14-16Mar-28-16Apr-11-16Apr-25-16May-09-16May-23-16-50-250255075

  Individual Data Points Table

Download (CSV)
Table Controls
Select page: First Prev 1 - 10 / 2000 (2000) Next Last
   
Mouse ID
Date
Sex
Genotype
Experimenter
Exit Reason
Review Action
learning_slope
J37899 2016-05-20 Female Nsun7 -/- 199 Finished Pipeline DCC 11.6
J36442 2016-05-20 Female Htr7 -/- 199 Finished Pipeline DCC 36.9
J36446 2016-05-20 Female Htr7 -/- 199 Finished Pipeline DCC 18.4
J40008 2016-05-20 Female Mpdz -/- 199 Finished Pipeline DCC 18.3
J40009 2016-05-20 Female Mpdz -/- 199 Finished Pipeline DCC 11.7
J38686 2016-05-20 Female Gramd1c -/- 199 Finished Pipeline DCC 22.5
J38688 2016-05-20 Female Gramd1c -/- 199 Finished Pipeline DCC 35.2
J38703 2016-05-20 Male Gramd1c -/- 199 Finished Pipeline DCC 27.8
J38732 2016-05-20 Male Gramd1c -/- 199 Finished Pipeline DCC 34.1
J38726 2016-05-20 Female Gramd1c -/- 199 Finished Pipeline DCC 16.4
J38733 2016-05-20 Male Gramd1c -/- 199 Finished Pipeline DCC 9.3
J38735 2016-05-20 Male Gramd1c -/- 199 Finished Pipeline DCC 17.8
J38736 2016-05-20 Male Gramd1c -/- 199 Finished Pipeline DCC 26.8
J38595 2016-05-20 Male Tmem14a -/- 199 Finished Pipeline DCC 19.2
J38593 2016-05-20 Male Tmem14a -/- 199 Finished Pipeline DCC 18.9
J38792 2016-05-20 Male Nmb -/- 199 Finished Pipeline DCC 35.1
J38800 2016-05-20 Female Nmb -/- 199 Finished Pipeline DCC 31.1
J38790 2016-05-20 Male Nmb -/- 199 Finished Pipeline DCC 16.4
J38793 2016-05-20 Male Nmb -/- 199 Finished Pipeline DCC 23.8
J37013 2016-05-20 Male Kcnd3 -/- 199 Finished Pipeline DCC 10.5
J38169 2016-05-20 Male Satb1 -/+ 199 Finished Pipeline DCC 9.0
J38170 2016-05-20 Male Satb1 -/+ 199 Finished Pipeline DCC 2.0
J38171 2016-05-20 Male Satb1 -/+ 199 Finished Pipeline DCC 18.8
J38397 2016-05-20 Female Cnbp -/+ 199 Finished Pipeline DCC 33.8
J38401 2016-05-20 Male Cnbp -/+ 199 Finished Pipeline DCC 20.0
J38404 2016-05-20 Female Cnbp -/+ 199 Finished Pipeline DCC 22.2
J38405 2016-05-20 Female Cnbp -/+ 199 Finished Pipeline DCC 24.0
J38408 2016-05-20 Male Cnbp -/+ 199 Finished Pipeline DCC 26.5
J38406 2016-05-20 Female Cnbp -/+ 199 Finished Pipeline DCC -0.7
J38890 2016-05-20 Female Poc1a -/+ 199 Finished Pipeline DCC 25.6
J38895 2016-05-20 Male Poc1a -/+ 199 Finished Pipeline DCC -3.7
J38891 2016-05-20 Female Poc1a -/+ 199 Finished Pipeline DCC 19.4
J38892 2016-05-20 Male Poc1a -/+ 199 Finished Pipeline DCC 1.8
J38893 2016-05-20 Male Poc1a -/+ 199 Finished Pipeline DCC 19.5
J39690 2016-05-20 Male Rnf13 -/- 199 Finished Pipeline DCC 2.7
J39691 2016-05-20 Male Rnf13 -/- 199 Finished Pipeline DCC 22.5
J36160 2016-05-20 Female Syce1/2J -/- 199 Finished Pipeline DCC 33.2
J36161 2016-05-20 Female Syce1/2J -/- 199 Finished Pipeline DCC 31.8
J38978 2016-05-20 Female 4932438A13Rik -/+ 199 Finished Pipeline DCC 5.6
J38979 2016-05-20 Male 4932438A13Rik -/+ 199 Finished Pipeline DCC 2.5
J38980 2016-05-20 Male 4932438A13Rik -/+ 199 Finished Pipeline DCC 10.5
J38982 2016-05-20 Female 4932438A13Rik -/+ 199 Finished Pipeline DCC 11.4
J38986 2016-05-20 Male 4932438A13Rik -/+ 199 Found Dead DCC -4.2
J38981 2016-05-20 Male 4932438A13Rik -/+ 199 Finished Pipeline DCC -3.1
J38983 2016-05-20 Female 4932438A13Rik -/+ 199 Finished Pipeline DCC 22.8
J38984 2016-05-20 Female 4932438A13Rik -/+ 199 Finished Pipeline DCC 26.4
J38985 2016-05-20 Male 4932438A13Rik -/+ 199 Finished Pipeline DCC 4.4
J40212 2016-05-20 Female C57BL/6NJ 199 Finished Pipeline DCC 26.7
J40213 2016-05-20 Female C57BL/6NJ 199 Finished Pipeline DCC 23.0
J40217 2016-05-20 Male C57BL/6NJ 199 Finished Pipeline DCC 33.2
J40218 2016-05-20 Male C57BL/6NJ 199 Finished Pipeline DCC 7.8
J40214 2016-05-20 Female C57BL/6NJ 199 Finished Pipeline DCC 24.5
J40219 2016-05-20 Male C57BL/6NJ 199 Finished Pipeline DCC 44.2
J40215 2016-05-20 Female C57BL/6NJ 199 Finished Pipeline DCC 35.8
J40220 2016-05-20 Male C57BL/6NJ 199 Finished Pipeline DCC 17.5
J40216 2016-05-20 Female C57BL/6NJ 199 Finished Pipeline DCC 25.5
J40221 2016-05-20 Male C57BL/6NJ 199 Finished Pipeline DCC 4.7
J39013 2016-05-20 Female Dhx29 -/+ 199 Finished Pipeline DCC 22.8
J39015 2016-05-20 Male Dhx29 -/+ 199 Finished Pipeline DCC 33.2
J39016 2016-05-20 Male Dhx29 -/+ 199 Finished Pipeline DCC 17.3
J39017 2016-05-20 Male Dhx29 -/+ 199 Finished Pipeline DCC 2.9
J37183 2016-05-20 Male Mapk15 -/- 199 Finished Pipeline DCC 21.4
J37194 2016-05-20 Female Mapk15 -/- 199 Finished Pipeline DCC 31.9
J37184 2016-05-20 Male Mapk15 -/- 199 Finished Pipeline DCC 15.5
J37205 2016-05-20 Male Mapk15 -/- 199 Finished Pipeline DCC -23.7
J37202 2016-05-20 Male Mapk15 -/- 199 Finished Pipeline DCC 9.6
J37204 2016-05-20 Male Mapk15 -/- 199 Finished Pipeline DCC 25.8
J37274 2016-05-20 Female Npff -/- 199 Finished Pipeline DCC 22.0
J37275 2016-05-20 Male Npff -/- 199 Found Dead DCC -8.6
J37281 2016-05-20 Female Npff -/- 199 Finished Pipeline DCC 31.7
J37285 2016-05-20 Male Npff -/- 199 Found Dead DCC 27.2
J37280 2016-05-20 Female Npff -/- 199 Finished Pipeline DCC 18.9
J37150 2016-05-20 Female Mos -/- 199 Finished Pipeline DCC 20.7
J37151 2016-05-20 Female Mos -/- 199 Finished Pipeline DCC 16.6
J36981 2016-05-20 Male Dnase1l2 -/- 199 Finished Pipeline DCC 6.2
J36982 2016-05-20 Male Dnase1l2 -/- 199 Finished Pipeline DCC 6.0
J36985 2016-05-20 Male Dnase1l2 -/- 199 Finished Pipeline DCC 14.8
J37412 2016-05-20 Female Pla2g7 -/- 199 Finished Pipeline DCC 11.9
J37418 2016-05-20 Male Pla2g7 -/- 199 Finished Pipeline DCC 26.9
J37419 2016-05-20 Male Pla2g7 -/- 199 Finished Pipeline DCC 1.0
J37422 2016-05-20 Female Pla2g7 -/- 199 Finished Pipeline DCC 30.4
J37420 2016-05-20 Male Pla2g7 -/- 199 Finished Pipeline DCC 27.3
J37423 2016-05-20 Female Pla2g7 -/- 199 Finished Pipeline DCC 26.5
J39624 2016-05-20 Female Ap4e1 -/- 199 Finished Pipeline DCC 9.3
J39628 2016-05-20 Male Ap4e1 -/- 199 Finished Pipeline DCC 30.9
J39625 2016-05-20 Female Ap4e1 -/- 199 Finished Pipeline DCC 31.4
J39627 2016-05-20 Male Ap4e1 -/- 199 Finished Pipeline DCC 32.7
J39623 2016-05-20 Female Ap4e1 -/- 199 Finished Pipeline DCC 13.8
J39626 2016-05-20 Male Ap4e1 -/- 199 Finished Pipeline DCC 32.0
J37119 2016-05-20 Female Mtmr3 -/- 199 Finished Pipeline DCC 5.3
J37120 2016-05-20 Female Mtmr3 -/- 199 Finished Pipeline DCC 13.1
J37072 2016-05-20 Male Olfml2b -/- 199 Finished Pipeline DCC 18.0
J37075 2016-05-20 Male Olfml2b -/- 199 Finished Pipeline DCC -0.3
J38844 2016-05-20 Female Thsd7a -/- 199 Finished Pipeline DCC 18.2
J38852 2016-05-20 Female Thsd7a -/- 199 Finished Pipeline DCC 13.3
J38835 2016-05-20 Female Thsd7a -/- 199 Finished Pipeline DCC 31.3
J38846 2016-05-20 Female Thsd7a -/- 199 Finished Pipeline DCC 19.3
J38848 2016-05-20 Female Thsd7a -/- 199 Finished Pipeline DCC 43.6
J38772 2016-05-20 Female Gpr19 -/- 199 Finished Pipeline DCC 4.4
J37177 2016-05-20 Male Psmc6 -/+ 199 Finished Pipeline DCC 0.3
J37178 2016-05-20 Male Psmc6 -/+ 199 Finished Pipeline DCC 19.9
J37179 2016-05-20 Male Psmc6 -/+ 199 Finished Pipeline DCC 11.6
J37330 2016-05-20 Female Prkab1 -/- 199 Finished Pipeline DCC 34.1
J37332 2016-05-20 Female Prkab1 -/- 199 Finished Pipeline DCC 26.9
J39164 2016-05-13 Male Pcdh12 -/- 199 Finished Pipeline DCC 40.2
J35516 2016-05-13 Male Dbf4 -/+ 199 Finished Pipeline DCC 18.2
J35517 2016-05-13 Male Dbf4 -/+ 199 Finished Pipeline DCC 23.6
J37156 2016-05-13 Female Pbsn -/- 199 Finished Pipeline DCC 15.2
J37161 2016-05-13 Male Pbsn -/Y 199 Finished Pipeline DCC 23.4
J37158 2016-05-13 Female Pbsn -/- 199 Finished Pipeline DCC 20.4
J36267 2016-05-13 Female Serpina1f -/- 199 Finished Pipeline DCC 33.5
J39513 2016-05-13 Female C57BL/6NJ 199 Finished Pipeline DCC 21.6
J39514 2016-05-13 Female C57BL/6NJ 199 Finished Pipeline DCC 28.7
J39518 2016-05-13 Male C57BL/6NJ 199 Finished Pipeline DCC 25.8
J39519 2016-05-13 Male C57BL/6NJ 199 Finished Pipeline DCC 7.0
J39515 2016-05-13 Female C57BL/6NJ 199 Finished Pipeline DCC 2.7
J39520 2016-05-13 Male C57BL/6NJ 199 Finished Pipeline DCC 12.8
J39516 2016-05-13 Female C57BL/6NJ 199 Finished Pipeline DCC 10.4
J39521 2016-05-13 Male C57BL/6NJ 199 Finished Pipeline DCC 28.3
J39517 2016-05-13 Female C57BL/6NJ 199 Finished Pipeline DCC 28.6
J39522 2016-05-13 Male C57BL/6NJ 199 Finished Pipeline DCC 14.7
J36194 2016-05-13 Female Rab11fip4 -/- 199 Finished Pipeline DCC 6.2
J36609 2016-05-13 Female Toe1 -/+ 199 Finished Pipeline DCC 19.3
J36614 2016-05-13 Male Toe1 -/+ 199 Finished Pipeline DCC 25.6
J36610 2016-05-13 Female Toe1 -/+ 199 Finished Pipeline DCC 25.9
J36619 2016-05-13 Male Toe1 -/+ 199 Finished Pipeline DCC 3.5
J36613 2016-05-13 Female Toe1 -/+ 199 Finished Pipeline DCC 15.4
J36626 2016-05-13 Male Toe1 -/+ 199 Finished Pipeline DCC 4.8
J36621 2016-05-13 Female Toe1 -/+ 199 Finished Pipeline DCC 13.9
J36627 2016-05-13 Male Toe1 -/+ 199 Finished Pipeline DCC 2.6
J36628 2016-05-13 Male Toe1 -/+ 199 Finished Pipeline DCC 13.5
J37046 2016-05-13 Female Prss40 -/- 199 Finished Pipeline DCC 36.2
J36110 2016-05-13 Female Rnmt -/+ 199 Finished Pipeline DCC 26.6
J35316 2016-05-13 Female Myh1 -/- 199 Finished Pipeline DCC 7.8
J35317 2016-05-13 Female Myh1 -/- 199 Finished Pipeline DCC 3.1
J35324 2016-05-13 Male Myh1 -/- 199 Found Dead DCC 10.6
J38061 2016-05-13 Male Rexo4 -/- 199 Finished Pipeline DCC -0.7
J38062 2016-05-13 Male Rexo4 -/- 199 Finished Pipeline DCC 22.3
J36999 2016-05-13 Female Kcnd3 -/- 199 Finished Pipeline DCC 32.8
J37705 2016-05-13 Female Pip4k2c/2J -/- 199 Finished Pipeline DCC 4.9
J37709 2016-05-13 Female Pip4k2c/2J -/- 199 Finished Pipeline DCC 13.7
J37706 2016-05-13 Female Pip4k2c/2J -/- 199 Finished Pipeline DCC 22.7
J37707 2016-05-13 Female Pip4k2c/2J -/- 199 Finished Pipeline DCC 22.6
J37708 2016-05-13 Female Pip4k2c/2J -/- 199 Finished Pipeline DCC 48.0
J37710 2016-05-13 Female Pip4k2c/2J -/- 199 Finished Pipeline DCC 19.5
J37711 2016-05-13 Male Pip4k2c/2J -/- 199 Finished Pipeline DCC 30.3
J37048 2016-05-13 Female Rhbdf1 -/+ 199 Finished Pipeline DCC 16.7
J37049 2016-05-13 Female Rhbdf1 -/+ 199 Finished Pipeline DCC 5.4
J37054 2016-05-13 Male Rhbdf1 -/+ 199 Finished Pipeline DCC 21.4
J37067 2016-05-13 Male Rhbdf1 -/+ 199 Finished Pipeline DCC 9.8
J37051 2016-05-13 Female Rhbdf1 -/+ 199 Finished Pipeline DCC 21.9
J37057 2016-05-13 Female Rhbdf1 -/+ 199 Finished Pipeline DCC 2.1
J37065 2016-05-13 Male Rhbdf1 -/+ 199 Finished Pipeline DCC 6.8
J37060 2016-05-13 Female Rhbdf1 -/+ 199 Finished Pipeline DCC 22.5
J37061 2016-05-13 Female Rhbdf1 -/+ 199 Finished Pipeline DCC 32.6
J37066 2016-05-13 Male Rhbdf1 -/+ 199 Finished Pipeline DCC -3.5
J37055 2016-05-13 Male Rhbdf1 -/+ 199 Finished Pipeline DCC 15.5
J37063 2016-05-13 Female Rhbdf1 -/+ 199 Finished Pipeline DCC 23.3
J36570 2016-05-13 Male Gpr142 -/- 199 Finished Pipeline DCC 27.2
J38200 2016-05-13 Female Gpr156 -/- 199 Finished Pipeline DCC 4.3
J38201 2016-05-13 Female Gpr156 -/- 199 Finished Pipeline DCC -5.2
J38202 2016-05-13 Female Gpr156 -/- 199 Finished Pipeline DCC 21.8
J37832 2016-05-13 Female Fndc4 -/- 199 Finished Pipeline DCC 35.0
J37835 2016-05-13 Male Fndc4 -/- 199 Finished Pipeline DCC 19.8
J37833 2016-05-13 Female Fndc4 -/- 199 Finished Pipeline DCC 1.2
J37834 2016-05-13 Female Fndc4 -/- 199 Finished Pipeline DCC 18.3
J38409 2016-05-13 Female Abca16 -/- 199 Finished Pipeline DCC 22.5
J38414 2016-05-13 Male Abca16 -/- 199 Finished Pipeline DCC 20.9
J38410 2016-05-13 Female Abca16 -/- 199 Finished Pipeline DCC 27.4
J38411 2016-05-13 Female Abca16 -/- 199 Finished Pipeline DCC 10.1
J38415 2016-05-13 Male Abca16 -/- 199 Finished Pipeline DCC 9.0
J38412 2016-05-13 Female Abca16 -/- 199 Finished Pipeline DCC 33.8
J38413 2016-05-13 Female Abca16 -/- 199 Finished Pipeline DCC 18.6
J38416 2016-05-13 Male Abca16 -/- 199 Finished Pipeline DCC 11.8
J36972 2016-05-13 Male Ehmt2/2J -/+ 199 Finished Pipeline DCC 14.6
J36599 2016-05-13 Female Fkbp6 -/- 199 Finished Pipeline DCC 27.6
J37637 2016-05-13 Female Folh1 -/- 199 Finished Pipeline DCC 10.7
J37641 2016-05-13 Male Folh1 -/- 199 Finished Pipeline DCC 14.6
J37645 2016-05-13 Male Folh1 -/- 199 Finished Pipeline DCC 0.8
J37638 2016-05-13 Female Folh1 -/- 199 Finished Pipeline DCC 49.2
J37642 2016-05-13 Male Folh1 -/- 199 Finished Pipeline DCC 35.8
J37639 2016-05-13 Female Folh1 -/- 199 Finished Pipeline DCC 11.5
J37644 2016-05-13 Male Folh1 -/- 199 Finished Pipeline DCC 21.8
J37643 2016-05-13 Male Folh1 -/- 199 Finished Pipeline DCC 6.5
J35107 2016-05-13 Female Riiad1 -/+ 199 Finished Pipeline DCC 1.1
J35109 2016-05-13 Female Riiad1 -/+ 199 Finished Pipeline DCC 15.4
J35110 2016-05-13 Female Riiad1 -/+ 199 Finished Pipeline DCC 16.8
J37683 2016-05-13 Female Tas2r138 -/- 199 Finished Pipeline DCC 22.2
J37687 2016-05-13 Male Tas2r138 -/- 199 Finished Pipeline DCC 18.8
J37684 2016-05-13 Female Tas2r138 -/- 199 Finished Pipeline DCC 10.0
J37685 2016-05-13 Female Tas2r138 -/- 199 Finished Pipeline DCC 7.5
J37686 2016-05-13 Female Tas2r138 -/- 199 Finished Pipeline DCC 12.6
J37688 2016-05-13 Male Tas2r138 -/- 199 Finished Pipeline DCC -1.7
J35705 2016-05-13 Female Rbpj -/+ 199 Finished Pipeline DCC 23.2
J35728 2016-05-13 Male Rbpj -/+ 199 Finished Pipeline DCC 8.7
J35708 2016-05-13 Male Rbpj -/+ 199 Finished Pipeline DCC 29.8
J35726 2016-05-13 Female Rbpj -/+ 199 Finished Pipeline DCC 36.0
J35710 2016-05-13 Male Rbpj -/+ 199 Finished Pipeline DCC 25.8
J35725 2016-05-13 Female Rbpj -/+ 199 Finished Pipeline DCC 22.9
J36589 2016-05-13 Female Fkbp6 -/- 199 Finished Pipeline DCC 29.9
J35205 2016-05-06 Male Adad2 -/- 199 Finished Pipeline DCC 17.6
J35207 2016-05-06 Male Adad2 -/- 199 Finished Pipeline DCC 16.3
J34517 2016-05-06 Female Rad21l -/- 199 Finished Pipeline DCC 13.6
J35054 2016-05-06 Female Hnrnpc -/+ 199 Finished Pipeline DCC 13.5
J35055 2016-05-06 Female Hnrnpc -/+ 199 Finished Pipeline DCC 27.5
J35056 2016-05-06 Male Hnrnpc -/+ 199 Finished Pipeline DCC 14.3
J36886 2016-05-06 Female Slc5a5 -/- 199 Finished Pipeline DCC 9.8
J36893 2016-05-06 Male Slc5a5 -/- 199 Finished Pipeline DCC 26.9
J36887 2016-05-06 Female Slc5a5 -/- 199 Finished Pipeline DCC 29.5
J36896 2016-05-06 Male Slc5a5 -/- 199 Finished Pipeline DCC 17.3
J36888 2016-05-06 Female Slc5a5 -/- 199 Finished Pipeline DCC 22.6
J36895 2016-05-06 Male Slc5a5 -/- 199 Finished Pipeline DCC 29.8
J36889 2016-05-06 Female Slc5a5 -/- 199 Finished Pipeline DCC 0.3
J36894 2016-05-06 Male Slc5a5 -/- 199 Finished Pipeline DCC 2.2
J36884 2016-05-06 Female Rabac1 -/- 199 Finished Pipeline DCC 31.5
J36885 2016-05-06 Male Rabac1 -/- 199 Finished Pipeline DCC -6.3
J36573 2016-05-06 Female Ppp1r26 -/- 199 Finished Pipeline DCC 28.3
J36574 2016-05-06 Male Ppp1r26 -/- 199 Finished Pipeline DCC 35.9
J36575 2016-05-06 Male Ppp1r26 -/- 199 Finished Pipeline DCC 7.6
J36773 2016-05-06 Female Bex6 -/- 199 Finished Pipeline DCC 30.4
J36775 2016-05-06 Male Bex6 -/- 199 Finished Pipeline DCC -6.1
J36770 2016-05-06 Male Bex6 -/- 199 Other DCC -6.1
J36774 2016-05-06 Female Bex6 -/- 199 Finished Pipeline DCC 15.8
J36778 2016-05-06 Male Bex6 -/- 199 Finished Pipeline DCC 29.5
J36776 2016-05-06 Male Bex6 -/- 199 Finished Pipeline DCC 30.2
J36777 2016-05-06 Male Bex6 -/- 199 Finished Pipeline DCC 23.8
J36779 2016-05-06 Female Bex6 -/- 199 Finished Pipeline DCC 22.7
J36782 2016-05-06 Female Bex6 -/- 199 Finished Pipeline DCC 19.2
J36771 2016-05-06 Male Bex6 -/- 199 Other DCC 29.7
J36772 2016-05-06 Male Bex6 -/- 199 Other DCC 26.3
J36780 2016-05-06 Female Bex6 -/- 199 Finished Pipeline DCC 27.9
J36781 2016-05-06 Female Bex6 -/- 199 Finished Pipeline DCC 24.4
J37853 2016-05-06 Female Nmb -/- 199 Finished Pipeline DCC 0.2
J37854 2016-05-06 Female Nmb -/- 199 Finished Pipeline DCC -12.9
J37855 2016-05-06 Female Nmb -/- 199 Finished Pipeline DCC 12.1
J34813 2016-05-06 Female Wdr17 -/- 199 Finished Pipeline DCC 16.8
J35305 2016-05-06 Female Spag17 -/- 199 Finished Pipeline DCC 56.8
J35306 2016-05-06 Female Spag17 -/- 199 Finished Pipeline DCC -0.2
J35310 2016-05-06 Male Spag17 -/- 199 Finished Pipeline DCC 19.8
J34963 2016-05-06 Female Rab3c -/- 199 Finished Pipeline DCC 32.1
J34965 2016-05-06 Male Rab3c -/- 199 Finished Pipeline DCC 15.6
J34966 2016-05-06 Male Rab3c -/- 199 Finished Pipeline DCC 10.7
J34969 2016-05-06 Female Rab3c -/- 199 Finished Pipeline DCC -5.8
J34970 2016-05-06 Female Rab3c -/- 199 Finished Pipeline DCC 9.5
J35099 2016-05-06 Female Riiad1 -/+ 199 Finished Pipeline DCC 25.8
J35131 2016-05-06 Male Riiad1 -/+ 199 Finished Pipeline DCC 17.3
J35137 2016-05-06 Male Riiad1 -/+ 199 Finished Pipeline DCC 23.1
J35142 2016-05-06 Female Riiad1 -/+ 199 Finished Pipeline DCC 21.7
J35119 2016-05-06 Female Riiad1 -/+ 199 Finished Pipeline DCC 20.4
J35121 2016-05-06 Male Riiad1 -/+ 199 Finished Pipeline DCC 20.7
J35136 2016-05-06 Male Riiad1 -/+ 199 Finished Pipeline DCC 29.7
J35128 2016-05-06 Female Riiad1 -/+ 199 Finished Pipeline DCC 6.2
J35132 2016-05-06 Male Riiad1 -/+ 199 Finished Pipeline DCC 17.6
J35138 2016-05-06 Male Riiad1 -/+ 199 Finished Pipeline DCC 12.3
J35134 2016-05-06 Male Riiad1 -/+ 199 Found Dead DCC 25.3
J35141 2016-05-06 Female Riiad1 -/+ 199 Finished Pipeline DCC 20.0
J34772 2016-05-06 Female Rnf10 -/- 199 Finished Pipeline DCC -7.6
J34773 2016-05-06 Male Rnf10 -/- 199 Finished Pipeline DCC 18.9
J38007 2016-05-06 Female C57BL/6NJ 199 Finished Pipeline DCC 20.5
J38008 2016-05-06 Female C57BL/6NJ 199 Finished Pipeline DCC 17.1
J38012 2016-05-06 Male C57BL/6NJ 199 Finished Pipeline DCC 39.2
J38013 2016-05-06 Male C57BL/6NJ 199 Finished Pipeline DCC 1.5
J38009 2016-05-06 Female C57BL/6NJ 199 Finished Pipeline DCC 32.9
J38014 2016-05-06 Male C57BL/6NJ 199 Finished Pipeline DCC 26.5
J38010 2016-05-06 Female C57BL/6NJ 199 Finished Pipeline DCC 14.6
J38015 2016-05-06 Male C57BL/6NJ 199 Finished Pipeline DCC 12.7
J38011 2016-05-06 Female C57BL/6NJ 199 Finished Pipeline DCC 0.4
J38016 2016-05-06 Male C57BL/6NJ 199 Finished Pipeline DCC 20.9
J35661 2016-05-06 Female Ccdc78 -/- 199 Finished Pipeline DCC 18.9
J35662 2016-05-06 Female Ccdc78 -/- 199 Finished Pipeline DCC 28.1
J35684 2016-05-06 Male Ccdc78 -/- 199 Finished Pipeline DCC 26.7
J35333 2016-05-06 Male Dennd2d -/+ 199 Finished Pipeline DCC 16.9
J36909 2016-05-06 Female Cyp2c23 -/- 199 Finished Pipeline DCC 37.9
J36917 2016-05-06 Male Cyp2c23 -/- 199 Finished Pipeline DCC 4.9
J36918 2016-05-06 Male Cyp2c23 -/- 199 Finished Pipeline DCC 35.3
J36910 2016-05-06 Female Cyp2c23 -/- 199 Finished Pipeline DCC 14.1
J36914 2016-05-06 Male Cyp2c23 -/- 199 Finished Pipeline DCC 5.8
J36911 2016-05-06 Female Cyp2c23 -/- 199 Finished Pipeline DCC 13.5
J36912 2016-05-06 Female Cyp2c23 -/- 199 Finished Pipeline DCC 15.2
J36915 2016-05-06 Male Cyp2c23 -/- 199 Finished Pipeline DCC 17.6
J36913 2016-05-06 Female Cyp2c23 -/- 199 Finished Pipeline DCC 36.4
J36916 2016-05-06 Male Cyp2c23 -/- 199 Finished Pipeline DCC 24.6
J37927 2016-05-06 Female C57BL/6NJ 199 Finished Pipeline DCC 20.4
J37928 2016-05-06 Female C57BL/6NJ 199 Finished Pipeline DCC 26.5
J37932 2016-05-06 Male C57BL/6NJ 199 Finished Pipeline DCC 33.9
J37933 2016-05-06 Male C57BL/6NJ 199 Finished Pipeline DCC 11.1
J37929 2016-05-06 Female C57BL/6NJ 199 Finished Pipeline DCC 18.4
J37934 2016-05-06 Male C57BL/6NJ 199 Finished Pipeline DCC 19.1
J37930 2016-05-06 Female C57BL/6NJ 199 Finished Pipeline DCC 3.8
J37935 2016-05-06 Male C57BL/6NJ 199 Finished Pipeline DCC -3.6
J37931 2016-05-06 Female C57BL/6NJ 199 Finished Pipeline DCC 29.8
J37936 2016-05-06 Male C57BL/6NJ 199 Finished Pipeline DCC 6.2
J34926 2016-05-06 Female Folh1 -/- 199 Finished Pipeline DCC 23.5
J34933 2016-05-06 Male Folh1 -/- 199 Finished Pipeline DCC 27.0
J35180 2016-05-06 Male Ovch2 -/- 199 Finished Pipeline DCC 35.1
J35182 2016-05-06 Male Ovch2 -/- 199 Finished Pipeline DCC 37.1
J35183 2016-05-06 Male Ovch2 -/- 199 Finished Pipeline DCC 25.3
J35173 2016-05-06 Male Ovch2 -/- 199 Finished Pipeline DCC 15.6
J36631 2016-05-06 Female Toe1 -/+ 199 Finished Pipeline DCC 26.9
J36633 2016-05-06 Female Toe1 -/+ 199 Finished Pipeline DCC -7.9
J36634 2016-05-06 Female Toe1 -/+ 199 Finished Pipeline DCC -23.3
J36635 2016-05-06 Female Toe1 -/+ 199 Finished Pipeline DCC 18.1
J35700 2016-05-06 Female Rbpj -/+ 199 Finished Pipeline DCC 46.4
J35711 2016-05-06 Female Rbpj -/+ 199 Finished Pipeline DCC 28.2
J35712 2016-05-06 Female Rbpj -/+ 199 Finished Pipeline DCC 19.8
J35713 2016-05-06 Female Rbpj -/+ 199 Finished Pipeline DCC 13.6
J35714 2016-05-06 Female Rbpj -/+ 199 Finished Pipeline DCC 16.0
J36243 2016-05-06 Female Ltbp2 -/- 199 Finished Pipeline DCC 26.6
J36245 2016-05-06 Female Ltbp2 -/- 199 Finished Pipeline DCC 12.1
J34480 2016-04-29 Female Masp1 -/- 199 Other DCC 26.0
J36549 2016-04-29 Female C57BL/6NJ 199 Finished Pipeline DCC 13.6
J36550 2016-04-29 Female C57BL/6NJ 199 Finished Pipeline DCC 26.9
J36554 2016-04-29 Male C57BL/6NJ 199 Finished Pipeline DCC 15.2
J36555 2016-04-29 Male C57BL/6NJ 199 Finished Pipeline DCC 14.9
J36551 2016-04-29 Female C57BL/6NJ 199 Finished Pipeline DCC 21.9
J36556 2016-04-29 Male C57BL/6NJ 199 Finished Pipeline DCC 13.4
J36552 2016-04-29 Female C57BL/6NJ 199 Finished Pipeline DCC 0.8
J36557 2016-04-29 Male C57BL/6NJ 199 Finished Pipeline DCC 15.9
J36553 2016-04-29 Female C57BL/6NJ 199 Finished Pipeline DCC 14.8
J36558 2016-04-29 Male C57BL/6NJ 199 Finished Pipeline DCC -4.5
J34507 2016-04-29 Male Dbf4 -/+ 199 Finished Pipeline DCC 37.3
J34510 2016-04-29 Male Dbf4 -/+ 199 Finished Pipeline DCC 36.7
J35807 2016-04-29 Female Myo3a -/- 199 Finished Pipeline DCC 14.0
J35809 2016-04-29 Male Myo3a -/- 199 Finished Pipeline DCC 28.8
J35810 2016-04-29 Male Myo3a -/- 199 Finished Pipeline DCC 13.6
J35812 2016-04-29 Female Myo3a -/- 199 Finished Pipeline DCC 13.0
J35811 2016-04-29 Male Myo3a -/- 199 Finished Pipeline DCC 26.8
J35813 2016-04-29 Female Myo3a -/- 199 Finished Pipeline DCC 4.6
J35814 2016-04-29 Male Myo3a -/- 199 Finished Pipeline DCC -9.1
J35815 2016-04-29 Male Myo3a -/- 199 Finished Pipeline DCC 30.8
J34740 2016-04-29 Female Serpina1f -/- 199 Finished Pipeline DCC 22.8
J34746 2016-04-29 Female Serpina1f -/- 199 Finished Pipeline DCC 17.9
J35585 2016-04-29 Female Limch1 -/- 199 Finished Pipeline DCC 28.2
J35586 2016-04-29 Female Limch1 -/- 199 Finished Pipeline DCC 36.8
J35587 2016-04-29 Female Limch1 -/- 199 Finished Pipeline DCC 21.6
J35588 2016-04-29 Female Limch1 -/- 199 Finished Pipeline DCC 18.5
J35589 2016-04-29 Male Limch1 -/- 199 Finished Pipeline DCC 43.5
J35590 2016-04-29 Male Limch1 -/- 199 Finished Pipeline DCC 31.2
J35591 2016-04-29 Male Limch1 -/- 199 Finished Pipeline DCC 14.8
J35592 2016-04-29 Male Limch1 -/- 199 Finished Pipeline DCC 29.5
J34995 2016-04-29 Female Rabac1 -/- 199 Finished Pipeline DCC 25.7
J35001 2016-04-29 Male Rabac1 -/- 199 Finished Pipeline DCC 30.9
J35011 2016-04-29 Male Rabac1 -/- 199 Finished Pipeline DCC -8.7
J34999 2016-04-29 Male Rabac1 -/- 199 Finished Pipeline DCC -4.7
J35604 2016-04-29 Female Bex6 -/- 199 Finished Pipeline DCC -6.3
J35606 2016-04-29 Male Bex6 -/- 199 Finished Pipeline DCC 20.4
J35605 2016-04-29 Female Bex6 -/- 199 Finished Pipeline DCC 24.0
J34988 2016-04-29 Female Scg2 -/- 199 Finished Pipeline DCC 18.8
J34993 2016-04-29 Male Scg2 -/- 199 Finished Pipeline DCC 26.6
J34843 2016-04-29 Female Spink12 -/- 199 Finished Pipeline DCC 14.9
J34845 2016-04-29 Male Spink12 -/- 199 Finished Pipeline DCC 36.4
J34853 2016-04-29 Female Spink12 -/- 199 Finished Pipeline DCC 25.3
J34862 2016-04-29 Male Spink12 -/- 199 Finished Pipeline DCC 25.0
J34855 2016-04-29 Female Spink12 -/- 199 Finished Pipeline DCC 2.1
J34868 2016-04-29 Male Spink12 -/- 199 Finished Pipeline DCC 4.0
J35635 2016-04-29 Female Spink12 -/- 199 Finished Pipeline DCC -8.8
J34975 2016-04-29 Female Rab3c -/- 199 Finished Pipeline DCC 4.2
J34978 2016-04-29 Male Rab3c -/- 199 Finished Pipeline DCC 0.8
J33241 2016-04-29 Male Rab11fip4 -/- 199 Finished Pipeline DCC -12.5
J34758 2016-04-29 Female Rab11fip4 -/- 199 Finished Pipeline DCC 35.9
J33245 2016-04-29 Male Rab11fip4 -/- 199 Finished Pipeline DCC 16.0
J34762 2016-04-29 Male Rab11fip4 -/- 199 Finished Pipeline DCC -4.1
J33247 2016-04-29 Male Rab11fip4 -/- 199 Finished Pipeline DCC 6.1
J34763 2016-04-29 Male Rab11fip4 -/- 199 Finished Pipeline DCC 3.6
J34819 2016-04-29 Female Rnmt -/+ 199 Finished Pipeline DCC -11.3
J34823 2016-04-29 Male Rnmt -/+ 199 Finished Pipeline DCC 18.5
J34821 2016-04-29 Female Rnmt -/+ 199 Finished Pipeline DCC 13.6
J34824 2016-04-29 Male Rnmt -/+ 199 Finished Pipeline DCC 10.2
J34825 2016-04-29 Male Rnmt -/+ 199 Finished Pipeline DCC 7.0
J34826 2016-04-29 Male Rnmt -/+ 199 Finished Pipeline DCC 12.1
J35593 2016-04-29 Female Gpr19 -/- 199 Finished Pipeline DCC 15.0
J35595 2016-04-29 Male Gpr19 -/- 199 Finished Pipeline DCC 26.5
J35594 2016-04-29 Female Gpr19 -/- 199 Finished Pipeline DCC 37.6
J35596 2016-04-29 Male Gpr19 -/- 199 Finished Pipeline DCC 19.9
J35597 2016-04-29 Male Gpr19 -/- 199 Finished Pipeline DCC 13.6
J35598 2016-04-29 Male Gpr19 -/- 199 Finished Pipeline DCC 25.6
J34765 2016-04-29 Female Rnf10 -/- 199 Finished Pipeline DCC 14.2
J34777 2016-04-29 Female Rnf10 -/- 199 Finished Pipeline DCC 11.3
J34783 2016-04-29 Male Rnf10 -/- 199 Finished Pipeline DCC 8.6
J35044 2016-04-29 Female Hnrnpc -/+ 199 Finished Pipeline DCC 9.6
J35057 2016-04-29 Female Hnrnpc -/+ 199 Finished Pipeline DCC -28.0
J35062 2016-04-29 Male Hnrnpc -/+ 199 Finished Pipeline DCC 27.1
J35059 2016-04-29 Female Hnrnpc -/+ 199 Finished Pipeline DCC 34.9
J35291 2016-04-29 Female Spag17 -/- 199 Finished Pipeline DCC 14.3
J35293 2016-04-29 Female Spag17 -/- 199 Finished Pipeline DCC 36.8
J34918 2016-04-29 Female Folh1 -/- 199 Finished Pipeline DCC 16.8
J34430 2016-04-29 Male Sipa1l1 -/- 199 Finished Pipeline DCC 14.8
J34429 2016-04-29 Female Sipa1l1 -/- 199 Finished Pipeline DCC 17.6
J34433 2016-04-29 Male Sipa1l1 -/- 199 Finished Pipeline DCC 28.9
J34431 2016-04-29 Male Sipa1l1 -/- 199 Finished Pipeline DCC 4.3
J34432 2016-04-29 Male Sipa1l1 -/- 199 Finished Pipeline DCC 25.1
J35615 2016-04-29 Female Cyp2c23 -/- 199 Finished Pipeline DCC 36.1
J35616 2016-04-29 Female Cyp2c23 -/- 199 Finished Pipeline DCC 25.7
J35617 2016-04-29 Male Cyp2c23 -/- 199 Finished Pipeline DCC -0.9
J34795 2016-04-29 Male Wdr17 -/- 199 Finished Pipeline DCC 23.3
J34807 2016-04-29 Male Wdr17 -/- 199 Finished Pipeline DCC 35.5
J34808 2016-04-29 Male Wdr17 -/- 199 Finished Pipeline DCC 18.6
J36539 2016-04-29 Female C57BL/6NJ 199 Finished Pipeline DCC 9.8
J36540 2016-04-29 Female C57BL/6NJ 199 Finished Pipeline DCC 4.2
J36544 2016-04-29 Male C57BL/6NJ 199 Finished Pipeline DCC 23.3
J36545 2016-04-29 Male C57BL/6NJ 199 Finished Pipeline DCC 28.0
J36541 2016-04-29 Female C57BL/6NJ 199 Finished Pipeline DCC -22.3
J36542 2016-04-29 Female C57BL/6NJ 199 Finished Pipeline DCC -14.4
J36543 2016-04-29 Female C57BL/6NJ 199 Finished Pipeline DCC 9.8
J36548 2016-04-29 Male C57BL/6NJ 199 Finished Pipeline DCC 17.3
J35377 2016-04-22 Female C57BL/6NJ 199 Finished Pipeline DCC 28.5
J35378 2016-04-22 Female C57BL/6NJ 199 Finished Pipeline DCC 29.9
J35382 2016-04-22 Male C57BL/6NJ 199 Finished Pipeline DCC 16.5
J35379 2016-04-22 Female C57BL/6NJ 199 Finished Pipeline DCC 14.4
J35384 2016-04-22 Male C57BL/6NJ 199 Finished Pipeline DCC 16.4
J35380 2016-04-22 Female C57BL/6NJ 199 Finished Pipeline DCC 18.8
J35385 2016-04-22 Male C57BL/6NJ 199 Found Dead DCC 8.9
J35381 2016-04-22 Female C57BL/6NJ 199 Finished Pipeline DCC 5.7
J32528 2016-04-22 Female Serpina3n -/- 199 Finished Pipeline DCC 25.1
J32545 2016-04-22 Female Serpina3n -/- 199 Finished Pipeline DCC 6.3
J32546 2016-04-22 Female Serpina3n -/- 199 Finished Pipeline DCC 6.6
J35092 2016-04-22 Female Ubn1 -/- 199 Finished Pipeline DCC 23.0
J35096 2016-04-22 Male Ubn1 -/- 199 Finished Pipeline DCC 10.1
J35093 2016-04-22 Female Ubn1 -/- 199 Finished Pipeline DCC 8.5
J35094 2016-04-22 Female Ubn1 -/- 199 Finished Pipeline DCC 4.0
J35098 2016-04-22 Male Ubn1 -/- 199 Finished Pipeline DCC -2.2
J35095 2016-04-22 Female Ubn1 -/- 199 Finished Pipeline DCC 7.6
J35097 2016-04-22 Male Ubn1 -/- 199 Finished Pipeline DCC 7.6
J33340 2016-04-22 Female Postn -/- 199 Finished Pipeline DCC 21.2
J31629 2016-04-22 Female Adam32/2J -/- 199 Finished Pipeline DCC 13.9
J32858 2016-04-22 Male Olfml2b -/- 199 Finished Pipeline DCC 27.8
J34426 2016-04-22 Female Ltbp2 -/- 199 Finished Pipeline DCC 20.4
J34427 2016-04-22 Female Ltbp2 -/- 199 Finished Pipeline DCC 8.9
J34425 2016-04-22 Female Ltbp2 -/- 199 Finished Pipeline DCC 8.6
J34837 2016-04-22 Female Sprr1b/2J -/- 199 Finished Pipeline DCC 10.6
J32215 2016-04-22 Male Zfp40 -/- 199 Finished Pipeline DCC 13.0
J32046 2016-04-22 Male Whamm/3J -/- 199 Finished Pipeline DCC 15.8
J32048 2016-04-22 Male Whamm/3J -/- 199 Finished Pipeline DCC 16.5
J32474 2016-04-22 Female Zfp60 -/+ 199 Finished Pipeline DCC 8.7
J32476 2016-04-22 Female Zfp60 -/+ 199 Finished Pipeline DCC -19.6
J32477 2016-04-22 Female Zfp60 -/+ 199 Finished Pipeline DCC 27.4
J32479 2016-04-22 Male Zfp60 -/+ 199 Finished Pipeline DCC 5.8
J32478 2016-04-22 Male Zfp60 -/+ 199 Finished Pipeline DCC -11.4
J34716 2016-04-22 Female Cyp2u1 -/- 199 Finished Pipeline DCC 25.1
J34717 2016-04-22 Female Cyp2u1 -/- 199 Finished Pipeline DCC 17.6
J34719 2016-04-22 Male Cyp2u1 -/- 199 Finished Pipeline DCC -2.0
J35387 2016-04-22 Female C57BL/6NJ 199 Finished Pipeline DCC 29.8
J35388 2016-04-22 Female C57BL/6NJ 199 Finished Pipeline DCC 18.2
J35392 2016-04-22 Male C57BL/6NJ 199 Finished Pipeline DCC 4.9
J35393 2016-04-22 Male C57BL/6NJ 199 Finished Pipeline DCC 19.6
J35389 2016-04-22 Female C57BL/6NJ 199 Finished Pipeline DCC 30.7
J35394 2016-04-22 Male C57BL/6NJ 199 Finished Pipeline DCC 23.3
J35390 2016-04-22 Female C57BL/6NJ 199 Finished Pipeline DCC 14.6
J35395 2016-04-22 Male C57BL/6NJ 199 Finished Pipeline DCC 8.9
J35391 2016-04-22 Female C57BL/6NJ 199 Finished Pipeline DCC 23.9
J35396 2016-04-22 Male C57BL/6NJ 199 Finished Pipeline DCC 17.1
J33276 2016-04-22 Male Syce1/2J -/- 199 Finished Pipeline DCC 12.5
J33269 2016-04-22 Female Syce1/2J -/- 199 Finished Pipeline DCC 7.4
J33270 2016-04-22 Female Syce1/2J -/- 199 Finished Pipeline DCC 9.4
J33285 2016-04-22 Female Spink12 -/- 199 Finished Pipeline DCC 3.9
J33292 2016-04-22 Male Spink12 -/- 199 Finished Pipeline DCC 27.5
J33296 2016-04-22 Male Spink12 -/- 199 Finished Pipeline DCC 14.1
J33290 2016-04-22 Female Spink12 -/- 199 Finished Pipeline DCC 37.7
J33295 2016-04-22 Male Spink12 -/- 199 Finished Pipeline DCC 16.4
J33294 2016-04-22 Male Spink12 -/- 199 Finished Pipeline DCC 9.7
J32725 2016-04-22 Female Ccdc78 -/- 199 Finished Pipeline DCC 28.0
J32730 2016-04-22 Female Ccdc78 -/- 199 Finished Pipeline DCC -1.7
J32731 2016-04-22 Female Ccdc78 -/- 199 Finished Pipeline DCC 25.1
J32736 2016-04-22 Male Ccdc78 -/- 199 Finished Pipeline DCC -2.2
J32652 2016-04-22 Female Stk32c -/- 199 Finished Pipeline DCC 19.5
J32667 2016-04-22 Male Stk32c -/- 199 Finished Pipeline DCC 31.4
J32676 2016-04-22 Male Stk32c -/- 199 Finished Pipeline DCC -7.6
J32680 2016-04-22 Female Stk32c -/- 199 Finished Pipeline DCC 32.9
J32677 2016-04-22 Male Stk32c -/- 199 Finished Pipeline DCC 11.0
J32684 2016-04-22 Female Stk32c -/- 199 Finished Pipeline DCC -2.9
J31805 2016-04-22 Female Nfat5 -/+ 199 Finished Pipeline DCC 23.7
J31807 2016-04-22 Male Nfat5 -/+ 199 Finished Pipeline DCC 20.5
J31806 2016-04-22 Female Nfat5 -/+ 199 Finished Pipeline DCC 20.6
J31810 2016-04-22 Male Nfat5 -/+ 199 Finished Pipeline DCC 13.7
J34880 2016-04-22 Female 1700016K19Rik -/- 199 Finished Pipeline DCC 25.0
J34881 2016-04-22 Female 1700016K19Rik -/- 199 Finished Pipeline DCC 17.2
J34888 2016-04-22 Male 1700016K19Rik -/- 199 Finished Pipeline DCC 29.3
J34882 2016-04-22 Female 1700016K19Rik -/- 199 Finished Pipeline DCC -2.3
J34883 2016-04-22 Female 1700016K19Rik -/- 199 Finished Pipeline DCC 11.1
J34889 2016-04-22 Male 1700016K19Rik -/- 199 Finished Pipeline DCC 9.7
J34892 2016-04-22 Male 1700016K19Rik -/- 199 Finished Pipeline DCC 27.7
J34890 2016-04-22 Male 1700016K19Rik -/- 199 Finished Pipeline DCC 14.1
J34891 2016-04-22 Male 1700016K19Rik -/- 199 Finished Pipeline DCC 12.9
J32880 2016-04-22 Female Paqr7 -/- 199 Finished Pipeline DCC 12.2
J34900 2016-04-22 Female Cnbp -/+ 199 Finished Pipeline DCC 18.9
J34902 2016-04-22 Male Cnbp -/+ 199 Other DCC 10.0
J34903 2016-04-22 Female Cnbp -/+ 199 Finished Pipeline DCC 38.2
J34910 2016-04-22 Male Cnbp -/+ 199 Finished Pipeline DCC 15.0
J34905 2016-04-22 Female Cnbp -/+ 199 Finished Pipeline DCC -23.8
J34908 2016-04-22 Male Cnbp -/+ 199 Finished Pipeline DCC 4.5
J34907 2016-04-22 Female Cnbp -/+ 199 Finished Pipeline DCC 24.5
J34909 2016-04-22 Male Cnbp -/+ 199 Finished Pipeline DCC -2.5
J34942 2016-04-22 Female Folh1 -/- 199 Finished Pipeline DCC 13.2
J34943 2016-04-22 Female Folh1 -/- 199 Finished Pipeline DCC 19.1
J34957 2016-04-22 Male Folh1 -/- 199 Finished Pipeline DCC 12.5
J34944 2016-04-22 Female Folh1 -/- 199 Finished Pipeline DCC 18.7
J35449 2016-04-22 Female Plekha3 -/- 199 Finished Pipeline DCC 12.6
J35452 2016-04-22 Male Plekha3 -/- 199 Finished Pipeline DCC 19.6
J35450 2016-04-22 Female Plekha3 -/- 199 Finished Pipeline DCC 24.2
J35021 2016-04-22 Female Ffar2 -/- 199 Finished Pipeline DCC 18.8
J35025 2016-04-22 Male Ffar2 -/- 199 Finished Pipeline DCC 3.7
J35022 2016-04-22 Female Ffar2 -/- 199 Finished Pipeline DCC 7.9
J33260 2016-04-22 Male Rab11fip4 -/- 199 Finished Pipeline DCC 15.2
J33262 2016-04-22 Male Rab11fip4 -/- 199 Finished Pipeline DCC 0.9
J34793 2016-04-22 Female Wdr17 -/- 199 Finished Pipeline DCC -3.7
J30849 2016-04-08 Male Htr7 -/- 199 Finished Pipeline DCC 13.8
J30958 2016-04-08 Female Dbf4 -/+ 199 Finished Pipeline DCC 14.8
J30959 2016-04-08 Female Dbf4 -/+ 199 Finished Pipeline DCC 21.5
J30969 2016-04-08 Female Stat5b -/- 199 Finished Pipeline DCC 5.8
J30606 2016-04-08 Male Myh1 -/- 199 Finished Pipeline DCC 14.7
J29923 2016-04-08 Male Nmb -/- 199 Finished Pipeline DCC 15.1
J29926 2016-04-08 Male Nmb -/- 199 Finished Pipeline DCC 37.4
J30860 2016-04-08 Female Pip4k2c/2J -/- 199 Finished Pipeline DCC 15.7
J30862 2016-04-08 Male Pip4k2c/2J -/- 199 Finished Pipeline DCC 14.7
J30863 2016-04-08 Male Pip4k2c/2J -/- 199 Finished Pipeline DCC 16.8
J29657 2016-04-08 Female Rnmt -/+ 199 Finished Pipeline DCC 15.7
J29658 2016-04-08 Female Rnmt -/+ 199 Finished Pipeline DCC 14.9
J30147 2016-04-08 Male Kif3c -/+ 199 Finished Pipeline DCC 12.4
J30150 2016-04-08 Male Kif3c -/+ 199 Finished Pipeline DCC 12.1
J32368 2016-04-08 Male Sprr1b/2J -/- 199 Finished Pipeline DCC 10.2
J32367 2016-04-08 Female Sprr1b/2J -/- 199 Finished Pipeline DCC 18.6
J32366 2016-04-08 Female Sprr1b/2J -/- 199 Finished Pipeline DCC 27.4
J32365 2016-04-08 Female Sprr1b/2J -/- 199 Finished Pipeline DCC -20.5
J32551 2016-04-08 Female Tpcn1 -/- 199 Finished Pipeline DCC 27.5
J32554 2016-04-08 Male Tpcn1 -/- 199 Finished Pipeline DCC -3.8
J32552 2016-04-08 Female Tpcn1 -/- 199 Finished Pipeline DCC 20.4
J32714 2016-04-08 Female F2rl1 -/- 199 Finished Pipeline DCC 17.1
J32715 2016-04-08 Female F2rl1 -/- 199 Finished Pipeline DCC 18.6
J30917 2016-04-08 Female Heg1 -/+ 199 Finished Pipeline DCC -10.6
J30918 2016-04-08 Female Heg1 -/+ 199 Finished Pipeline DCC 14.4
J30930 2016-04-08 Male Heg1 -/+ 199 Finished Pipeline DCC 35.6
J30921 2016-04-08 Female Heg1 -/+ 199 Finished Pipeline DCC 15.8
J30926 2016-04-08 Male Heg1 -/+ 199 Finished Pipeline DCC 24.8
J30928 2016-04-08 Male Heg1 -/+ 199 Finished Pipeline DCC -6.4
J30922 2016-04-08 Female Heg1 -/+ 199 Finished Pipeline DCC 12.5
J30931 2016-04-08 Male Heg1 -/+ 199 Finished Pipeline DCC 14.1
J30932 2016-04-08 Female Heg1 -/+ 199 Finished Pipeline DCC 8.7
J30935 2016-04-08 Male Heg1 -/+ 199 Finished Pipeline DCC 19.4
J30373 2016-04-08 Male Rasa1 -/+ 199 Finished Pipeline DCC 39.4
J29890 2016-04-08 Male Fndc4 -/- 199 Finished Pipeline DCC 37.8
J29888 2016-04-08 Male Fndc4 -/- 199 Finished Pipeline DCC 18.8
J33485 2016-04-08 Female C57BL/6NJ 199 Finished Pipeline DCC 21.7
J33486 2016-04-08 Female C57BL/6NJ 199 Finished Pipeline DCC 11.8
J33490 2016-04-08 Male C57BL/6NJ 199 Finished Pipeline DCC 15.8
J33491 2016-04-08 Male C57BL/6NJ 199 Finished Pipeline DCC 22.3
J33487 2016-04-08 Female C57BL/6NJ 199 Finished Pipeline DCC 4.9
J33492 2016-04-08 Male C57BL/6NJ 199 Finished Pipeline DCC 28.3
J33488 2016-04-08 Female C57BL/6NJ 199 Finished Pipeline DCC -18.5
J33493 2016-04-08 Male C57BL/6NJ 199 Finished Pipeline DCC 2.6
J33489 2016-04-08 Female C57BL/6NJ 199 Finished Pipeline DCC 24.2
J33494 2016-04-08 Male C57BL/6NJ 199 Finished Pipeline DCC 12.7
J30424 2016-04-08 Male Nt5c1b -/- 199 Finished Pipeline DCC 55.2
J30427 2016-04-08 Male Nt5c1b -/- 199 Finished Pipeline DCC 6.9
J30428 2016-04-08 Male Nt5c1b -/- 199 Found Dead DCC 13.9
J30431 2016-04-08 Male Nt5c1b -/- 199 Finished Pipeline DCC 12.0
J33075 2016-04-08 Female Pard6a -/- 199 Finished Pipeline DCC -3.2
J33076 2016-04-08 Female Pard6a -/- 199 Finished Pipeline DCC 7.1
J33074 2016-04-08 Female Pard6a -/- 199 Finished Pipeline DCC -4.8
J30793 2016-04-08 Female Mcm4/2J -/+ 199 Finished Pipeline DCC 25.7
J30795 2016-04-08 Male Mcm4/2J -/+ 199 Finished Pipeline DCC 3.2
J30798 2016-04-08 Female Mcm4/2J -/+ 199 Finished Pipeline DCC 29.2
J30791 2016-04-08 Female Mcm4/2J -/+ 199 Finished Pipeline DCC 10.3
J30792 2016-04-08 Female Mcm4/2J -/+ 199 Finished Pipeline DCC 22.0
J30802 2016-04-08 Female Mcm4/2J -/+ 199 Finished Pipeline DCC 40.7
J30827 2016-04-08 Female Catsperz -/- 199 Finished Pipeline DCC 31.6
J30813 2016-04-08 Male Spag17 -/- 199 Finished Pipeline DCC 10.7
J33171 2016-04-08 Female Limch1 -/- 199 Finished Pipeline DCC 8.7
J33172 2016-04-08 Female Limch1 -/- 199 Finished Pipeline DCC 12.1
J33173 2016-04-08 Female Limch1 -/- 199 Finished Pipeline DCC 20.6
J33174 2016-04-08 Female Limch1 -/- 199 Finished Pipeline DCC 15.3
J33175 2016-04-08 Male Limch1 -/- 199 Finished Pipeline DCC 29.8
J33176 2016-04-08 Male Limch1 -/- 199 Finished Pipeline DCC 21.3
J33177 2016-04-08 Male Limch1 -/- 199 Finished Pipeline DCC 15.3
J33178 2016-04-08 Male Limch1 -/- 199 Finished Pipeline DCC 17.6
J32573 2016-04-08 Male R3hcc1l -/- 199 Finished Pipeline DCC 19.1
J32574 2016-04-08 Male R3hcc1l -/- 199 Finished Pipeline DCC 12.3
J30484 2016-04-08 Male Lrch1 -/- 199 Finished Pipeline DCC 10.5
J30478 2016-04-08 Female Lrch1 -/- 199 Finished Pipeline DCC 21.5
J29679 2016-04-08 Female Syce1/2J -/- 199 Finished Pipeline DCC 20.8
J29681 2016-04-08 Male Syce1/2J -/- 199 Finished Pipeline DCC 27.7
J29682 2016-04-08 Male Syce1/2J -/- 199 Finished Pipeline DCC 23.8
J33367 2016-04-08 Female C57BL/6NJ 199 Finished Pipeline DCC 1.1
J33368 2016-04-08 Female C57BL/6NJ 199 Finished Pipeline DCC 15.1
J33372 2016-04-08 Male C57BL/6NJ 199 Finished Pipeline DCC 18.0
J33373 2016-04-08 Male C57BL/6NJ 199 Finished Pipeline DCC 30.2
J33369 2016-04-08 Female C57BL/6NJ 199 Finished Pipeline DCC 13.5
J33374 2016-04-08 Male C57BL/6NJ 199 Finished Pipeline DCC 20.7
J33370 2016-04-08 Female C57BL/6NJ 199 Finished Pipeline DCC 19.4
J33375 2016-04-08 Male C57BL/6NJ 199 Finished Pipeline DCC 3.9
J33371 2016-04-08 Female C57BL/6NJ 199 Finished Pipeline DCC 10.8
J33376 2016-04-08 Male C57BL/6NJ 199 Finished Pipeline DCC -8.2
J32353 2016-04-08 Female Rabac1 -/- 199 Finished Pipeline DCC 34.1
J32362 2016-04-08 Male Rabac1 -/- 199 Finished Pipeline DCC 27.1
J32370 2016-04-08 Female Rabac1 -/- 199 Finished Pipeline DCC 15.6
J32380 2016-04-08 Male Rabac1 -/- 199 Finished Pipeline DCC 11.8
J32371 2016-04-08 Female Rabac1 -/- 199 Finished Pipeline DCC 26.3
J32376 2016-04-08 Female Rabac1 -/- 199 Finished Pipeline DCC 5.2
J32385 2016-04-08 Male Rabac1 -/- 199 Finished Pipeline DCC 24.3
J32387 2016-04-08 Male Rabac1 -/- 199 Finished Pipeline DCC 25.4
J33184 2016-04-08 Female Slc5a5 -/- 199 Finished Pipeline DCC 3.5
J33188 2016-04-08 Male Slc5a5 -/- 199 Finished Pipeline DCC 12.7
J33189 2016-04-08 Male Slc5a5 -/- 199 Finished Pipeline DCC 2.5
J32317 2016-04-08 Male Rab3c -/- 199 Finished Pipeline DCC 16.8
J31824 2016-04-01 Male Dnajc7 -/- 199 Finished Pipeline DCC 2.9
J31978 2016-04-01 Female C57BL/6NJ 199 Finished Pipeline DCC 17.2
J31979 2016-04-01 Female C57BL/6NJ 199 Finished Pipeline DCC 23.0
J31983 2016-04-01 Male C57BL/6NJ 199 Finished Pipeline DCC 12.6
J31984 2016-04-01 Male C57BL/6NJ 199 Finished Pipeline DCC 9.8
J31980 2016-04-01 Female C57BL/6NJ 199 Finished Pipeline DCC 13.0
J31985 2016-04-01 Male C57BL/6NJ 199 Finished Pipeline DCC -0.9
J31981 2016-04-01 Female C57BL/6NJ 199 None DCC 9.4
J31986 2016-04-01 Male C57BL/6NJ 199 Finished Pipeline DCC 23.6
J31982 2016-04-01 Female C57BL/6NJ 199 Finished Pipeline DCC 8.9
J31987 2016-04-01 Male C57BL/6NJ 199 Finished Pipeline DCC 29.2
J29504 2016-04-01 Female Serpina1f -/- 199 Finished Pipeline DCC 12.9
J29505 2016-04-01 Male Serpina1f -/- 199 Finished Pipeline DCC 16.1
J29515 2016-04-01 Male Serpina1f -/- 199 Finished Pipeline DCC 24.6
J30300 2016-04-01 Female Pate4 -/- 199 Finished Pipeline DCC 8.3
J30301 2016-04-01 Female Pate4 -/- 199 Finished Pipeline DCC 12.5
J30306 2016-04-01 Female Pate4 -/- 199 Finished Pipeline DCC 26.0
J29686 2016-04-01 Female Syce1/2J -/- 199 Finished Pipeline DCC 15.2
J30894 2016-04-01 Female Lcn2 -/- 199 Finished Pipeline DCC 19.3
J30895 2016-04-01 Female Lcn2 -/- 199 Finished Pipeline DCC 22.5
J30896 2016-04-01 Female Lcn2 -/- 199 Finished Pipeline DCC 4.8
J30902 2016-04-01 Male Lcn2 -/- 199 Finished Pipeline DCC 13.5
J29910 2016-04-01 Female Nmb -/- 199 Finished Pipeline DCC 15.6
J29916 2016-04-01 Male Nmb -/- 199 Finished Pipeline DCC 2.0
J29918 2016-04-01 Male Nmb -/- 199 Finished Pipeline DCC 16.7
J31051 2016-04-01 Female Ifnk -/- 199 Finished Pipeline DCC 16.0
J31055 2016-04-01 Male Ifnk -/- 199 Finished Pipeline DCC 11.8
J31056 2016-04-01 Male Ifnk -/- 199 Finished Pipeline DCC 6.0
J30376 2016-04-01 Female Rasa1 -/+ 199 Finished Pipeline DCC 6.1
J30377 2016-04-01 Female Rasa1 -/+ 199 Finished Pipeline DCC 18.3
J30379 2016-04-01 Female Rasa1 -/+ 199 Finished Pipeline DCC 16.0
J30380 2016-04-01 Female Rasa1 -/+ 199 Finished Pipeline DCC 20.4
J30381 2016-04-01 Female Rasa1 -/+ 199 Finished Pipeline DCC 35.7
J30383 2016-04-01 Female Rasa1 -/+ 199 Finished Pipeline DCC 14.6
J30388 2016-04-01 Male Rasa1 -/+ 199 Finished Pipeline DCC 25.3
J30022 2016-04-01 Female Scg2 -/- 199 Finished Pipeline DCC 20.0
J30498 2016-04-01 Female Abca16 -/- 199 Finished Pipeline DCC 21.0
J30500 2016-04-01 Male Abca16 -/- 199 Finished Pipeline DCC -4.9
J30503 2016-04-01 Male Abca16 -/- 199 Finished Pipeline DCC -5.9
J30504 2016-04-01 Female Abca16 -/- 199 Finished Pipeline DCC 18.3
J30505 2016-04-01 Female Abca16 -/- 199 Finished Pipeline DCC -2.6
J30509 2016-04-01 Male Abca16 -/- 199 Found Dead DCC 23.8
J28014 2016-04-01 Male Tmem181a -/- 199 Finished Pipeline DCC 24.1
J30464 2016-04-01 Male Tubb4a -/- 199 Finished Pipeline DCC 20.4
J30488 2016-04-01 Female Lrch1 -/- 199 Finished Pipeline DCC 19.7
J30491 2016-04-01 Male Lrch1 -/- 199 Finished Pipeline DCC 7.1
J30489 2016-04-01 Female Lrch1 -/- 199 Finished Pipeline DCC 9.4
J30490 2016-04-01 Female Lrch1 -/- 199 Finished Pipeline DCC 16.2
J30492 2016-04-01 Male Lrch1 -/- 199 Finished Pipeline DCC 20.2
J31460 2016-04-01 Male Sfxn4 -/- 199 Finished Pipeline DCC 23.0
J31461 2016-04-01 Male Sfxn4 -/- 199 Finished Pipeline DCC 3.8
J30120 2016-04-01 Female Prss40 -/- 199 Finished Pipeline DCC 9.6
J30128 2016-04-01 Female Prss40 -/- 199 Finished Pipeline DCC 29.0
J29648 2016-04-01 Female Rnmt -/+ 199 Finished Pipeline DCC 32.9
J29650 2016-04-01 Male Rnmt -/+ 199 Finished Pipeline DCC 2.5
J29654 2016-04-01 Female Rnmt -/+ 199 Finished Pipeline DCC 15.2
J31074 2016-04-01 Female Pla2g2d -/- 199 Finished Pipeline DCC 19.2
J31075 2016-04-01 Female Pla2g2d -/- 199 Finished Pipeline DCC -3.7
J31076 2016-04-01 Female Pla2g2d -/- 199 Finished Pipeline DCC 26.2
J31080 2016-04-01 Male Pla2g2d -/- 199 Finished Pipeline DCC 17.4
J31081 2016-04-01 Male Pla2g2d -/- 199 Finished Pipeline DCC 9.5
J31077 2016-04-01 Female Pla2g2d -/- 199 Finished Pipeline DCC 6.8
J31078 2016-04-01 Female Pla2g2d -/- 199 Finished Pipeline DCC 10.8
J31079 2016-04-01 Male Pla2g2d -/- 199 Finished Pipeline DCC 9.3
J30275 2016-04-01 Female Gfod1 -/- 199 Finished Pipeline DCC 18.9
J30276 2016-04-01 Male Gfod1 -/- 199 Finished Pipeline DCC 14.7
J30277 2016-04-01 Male Gfod1 -/- 199 Finished Pipeline DCC 18.1
J30286 2016-04-01 Male Gfod1 -/- 199 Finished Pipeline DCC 18.4
J30293 2016-04-01 Male Gfod1 -/- 199 Finished Pipeline DCC 17.3
J30180 2016-04-01 Female Efna4 -/- 199 Finished Pipeline DCC 8.5
J31535 2016-04-01 Female Tex101 -/- 199 Finished Pipeline DCC 14.4
J31536 2016-04-01 Female Tex101 -/- 199 Finished Pipeline DCC 16.1
J30513 2016-04-01 Female Plekha3 -/- 199 Finished Pipeline DCC 6.7
J30528 2016-04-01 Male Plekha3 -/- 199 Finished Pipeline DCC 21.4
J30525 2016-04-01 Female Plekha3 -/- 199 Finished Pipeline DCC 28.5
J30216 2016-04-01 Female Ehmt2/2J -/+ 199 Finished Pipeline DCC 10.0
J30217 2016-04-01 Female Ehmt2/2J -/+ 199 Finished Pipeline DCC 1.3
J30220 2016-04-01 Male Ehmt2/2J -/+ 199 Finished Pipeline DCC -6.9
J30221 2016-04-01 Male Ehmt2/2J -/+ 199 Finished Pipeline DCC 14.0
J29862 2016-04-01 Female Gpr19 -/- 199 Finished Pipeline DCC 19.0
J29867 2016-04-01 Male Gpr19 -/- 199 Finished Pipeline DCC 12.2
J29864 2016-04-01 Female Gpr19 -/- 199 Finished Pipeline DCC 4.2
J29866 2016-04-01 Female Gpr19 -/- 199 Finished Pipeline DCC 1.4
J30326 2016-04-01 Male Pold2 -/+ 199 Finished Pipeline DCC 10.8
J30327 2016-04-01 Male Pold2 -/+ 199 Finished Pipeline DCC 11.2
J30328 2016-04-01 Male Pold2 -/+ 199 Finished Pipeline DCC -4.4
J30389 2016-04-01 Female Nek7 -/+ 199 Finished Pipeline DCC 5.9
J30403 2016-04-01 Male Nek7 -/+ 199 Finished Pipeline DCC 14.0
J30404 2016-04-01 Male Nek7 -/+ 199 Finished Pipeline DCC -8.5
J30410 2016-04-01 Female Nek7 -/+ 199 Finished Pipeline DCC 18.8
J30392 2016-04-01 Male Nek7 -/+ 199 Finished Pipeline DCC 16.4
J30402 2016-04-01 Male Nek7 -/+ 199 Finished Pipeline DCC 21.9
J30412 2016-04-01 Female Nek7 -/+ 199 Finished Pipeline DCC 18.3
J30413 2016-04-01 Female Nek7 -/+ 199 Finished Pipeline DCC 11.1
J30408 2016-04-01 Male Nek7 -/+ 199 Finished Pipeline DCC 14.0
J30414 2016-04-01 Female Nek7 -/+ 199 Finished Pipeline DCC 14.1
J30405 2016-04-01 Male Nek7 -/+ 199 Finished Pipeline DCC -13.8
J30407 2016-04-01 Male Nek7 -/+ 199 Finished Pipeline DCC 2.9
J31965 2016-04-01 Female C57BL/6NJ 199 Finished Pipeline DCC 13.3
J31966 2016-04-01 Female C57BL/6NJ 199 Finished Pipeline DCC 35.7
J31970 2016-04-01 Male C57BL/6NJ 199 None DCC 3.2
J31971 2016-04-01 Male C57BL/6NJ 199 Finished Pipeline DCC 17.1
J31967 2016-04-01 Female C57BL/6NJ 199 Finished Pipeline DCC 26.3
J31972 2016-04-01 Male C57BL/6NJ 199 Finished Pipeline DCC 7.4
J31968 2016-04-01 Female C57BL/6NJ 199 Finished Pipeline DCC 13.6
J31973 2016-04-01 Male C57BL/6NJ 199 Finished Pipeline DCC 16.3
J31969 2016-04-01 Female C57BL/6NJ 199 Finished Pipeline DCC 5.5
J31974 2016-04-01 Male C57BL/6NJ 199 Finished Pipeline DCC 10.1
J27310 2016-03-25 Female Dbf4 -/+ 199 Finished Pipeline DCC 24.6
J27311 2016-03-25 Female Dbf4 -/+ 199 Finished Pipeline DCC 29.2
J27312 2016-03-25 Female Dbf4 -/+ 199 Finished Pipeline DCC 18.8
J27314 2016-03-25 Male Dbf4 -/+ 199 Finished Pipeline DCC 4.5
J30803 2016-03-25 Female Fastkd5 -/- 199 Finished Pipeline DCC 30.1
J30804 2016-03-25 Female Fastkd5 -/- 199 Finished Pipeline DCC 26.5
J30805 2016-03-25 Female Fastkd5 -/- 199 Finished Pipeline DCC 18.5
J30806 2016-03-25 Female Fastkd5 -/- 199 Finished Pipeline DCC 19.0
J30807 2016-03-25 Female Fastkd5 -/- 199 Finished Pipeline DCC 20.6
J31001 2016-03-25 Female C57BL/6NJ 199 Finished Pipeline DCC 1.2
J31002 2016-03-25 Female C57BL/6NJ 199 Finished Pipeline DCC 17.0
J31006 2016-03-25 Male C57BL/6NJ 199 Finished Pipeline DCC 12.2
J31007 2016-03-25 Male C57BL/6NJ 199 Finished Pipeline DCC 19.1
J31003 2016-03-25 Female C57BL/6NJ 199 Finished Pipeline DCC 12.5
J31009 2016-03-25 Male C57BL/6NJ 199 Finished Pipeline DCC 36.2
J31004 2016-03-25 Female C57BL/6NJ 199 Finished Pipeline DCC 31.6
J31008 2016-03-25 Male C57BL/6NJ 199 Finished Pipeline DCC 19.0
J31005 2016-03-25 Female C57BL/6NJ 199 Finished Pipeline DCC 21.2
J31010 2016-03-25 Male C57BL/6NJ 199 Finished Pipeline DCC 12.0
J30568 2016-03-25 Female Ppp1r26 -/- 199 Finished Pipeline DCC 9.6
J30573 2016-03-25 Male Ppp1r26 -/- 199 Finished Pipeline DCC -0.1
J30569 2016-03-25 Female Ppp1r26 -/- 199 Finished Pipeline DCC 21.4
J30574 2016-03-25 Male Ppp1r26 -/- 199 Finished Pipeline DCC 11.6
J30570 2016-03-25 Female Ppp1r26 -/- 199 Finished Pipeline DCC 13.3
J30571 2016-03-25 Female Ppp1r26 -/- 199 Finished Pipeline DCC -8.6
J30572 2016-03-25 Male Ppp1r26 -/- 199 Finished Pipeline DCC 1.1
J28616 2016-03-25 Male Rimklb -/- 199 Finished Pipeline DCC 19.1
J28293 2016-03-25 Male Rnf13 -/- 199 Finished Pipeline DCC 14.8
J27547 2016-03-25 Female F2rl1 -/- 199 Finished Pipeline DCC 17.3
J27549 2016-03-25 Female F2rl1 -/- 199 Finished Pipeline DCC 28.3
J28096 2016-03-25 Male Rap2b -/- 199 Other DCC 5.7
J27472 2016-03-25 Female Rab3c -/- 199 Finished Pipeline DCC 10.2
J27478 2016-03-25 Male Rab3c -/- 199 Finished Pipeline DCC 1.5
J27466 2016-03-25 Male Rab3c -/- 199 Finished Pipeline DCC 26.2
J28681 2016-03-25 Male Galnt12 -/- 199 Finished Pipeline DCC 27.4
J28688 2016-03-25 Male Galnt12 -/- 199 Finished Pipeline DCC 0.3
J28697 2016-03-25 Male Galnt12 -/- 199 Finished Pipeline DCC 20.0
J28702 2016-03-25 Male Galnt12 -/- 199 Finished Pipeline DCC 29.7
J27038 2016-03-25 Male Emilin3 -/- 199 Finished Pipeline DCC 38.8
J28227 2016-03-25 Female Mrpl22 -/+ 199 Finished Pipeline DCC 9.8
J28230 2016-03-25 Male Mrpl22 -/+ 199 Finished Pipeline DCC 7.0
J28414 2016-03-25 Female Adgra1 -/+ 199 Finished Pipeline DCC 31.4
J28419 2016-03-25 Female Adgra1 -/+ 199 Finished Pipeline DCC 23.3
J28449 2016-03-25 Male Adgra1 -/+ 199 Finished Pipeline DCC 18.7
J28464 2016-03-25 Male Adgra1 -/+ 199 Finished Pipeline DCC 7.4
J28420 2016-03-25 Female Adgra1 -/+ 199 Finished Pipeline DCC 8.5
J28421 2016-03-25 Female Adgra1 -/+ 199 Finished Pipeline DCC 9.8
J28465 2016-03-25 Male Adgra1 -/+ 199 Finished Pipeline DCC 31.5
J28467 2016-03-25 Male Adgra1 -/+ 199 Finished Pipeline DCC 25.9
J28415 2016-03-25 Female Adgra1 -/+ 199 Finished Pipeline DCC 23.2
J28422 2016-03-25 Female Adgra1 -/+ 199 Finished Pipeline DCC 12.3
J28423 2016-03-25 Male Adgra1 -/+ 199 Finished Pipeline DCC 6.1
J28450 2016-03-25 Male Adgra1 -/+ 199 Finished Pipeline DCC 8.5
J28418 2016-03-25 Female Adgra1 -/+ 199 Finished Pipeline DCC 4.0
J28442 2016-03-25 Female Adgra1 -/+ 199 Finished Pipeline DCC 27.3
J28451 2016-03-25 Male Adgra1 -/+ 199 Finished Pipeline DCC 2.4
J27782 2016-03-25 Female Irx1 -/+ 199 Finished Pipeline DCC -3.2
J27780 2016-03-25 Male Irx1 -/+ 199 Finished Pipeline DCC 8.0
J27262 2016-03-25 Female Ovch2 -/- 199 Finished Pipeline DCC 25.0
J27266 2016-03-25 Male Ovch2 -/- 199 Finished Pipeline DCC 10.3
J27263 2016-03-25 Female Ovch2 -/- 199 Finished Pipeline DCC 12.0
J27267 2016-03-25 Male Ovch2 -/- 199 Finished Pipeline DCC 8.1
J27264 2016-03-25 Female Ovch2 -/- 199 Finished Pipeline DCC 13.1
J27294 2016-03-25 Male Ovch2 -/- 199 Finished Pipeline DCC 17.4
J30363 2016-03-25 Female Rasa1 -/+ 199 Finished Pipeline DCC 7.0
J30364 2016-03-25 Male Rasa1 -/+ 199 Finished Pipeline DCC 28.9
J30368 2016-03-25 Male Rasa1 -/+ 199 Finished Pipeline DCC 7.6
J30370 2016-03-25 Male Rasa1 -/+ 199 Finished Pipeline DCC 22.1
J29394 2016-03-25 Male Ltbp2 -/- 199 Finished Pipeline DCC 29.0
J29520 2016-03-25 Male Serpina1f -/- 199 Finished Pipeline DCC 11.3
J29521 2016-03-25 Male Serpina1f -/- 199 Finished Pipeline DCC 17.1
J29524 2016-03-25 Male Serpina1f -/- 199 Finished Pipeline DCC 12.8
J29564 2016-03-25 Female Syce1l -/- 199 Finished Pipeline DCC 6.2
J29567 2016-03-25 Male Syce1l -/- 199 Finished Pipeline DCC 13.4
J29569 2016-03-25 Male Syce1l -/- 199 Finished Pipeline DCC 15.8
J29570 2016-03-25 Male Syce1l -/- 199 Finished Pipeline DCC 14.5
J29640 2016-03-25 Female Rnmt -/+ 199 Finished Pipeline DCC 29.7
J29643 2016-03-25 Male Rnmt -/+ 199 Finished Pipeline DCC 9.0
J29644 2016-03-25 Male Rnmt -/+ 199 Finished Pipeline DCC 18.7
J29646 2016-03-25 Male Rnmt -/+ 199 Finished Pipeline DCC 21.6
J29604 2016-03-25 Male Rnf10 -/- 199 Finished Pipeline DCC 19.1
J30545 2016-03-25 Female Sp5 -/- 199 Finished Pipeline DCC 28.4
J30546 2016-03-25 Female Sp5 -/- 199 Finished Pipeline DCC 30.7
J30547 2016-03-25 Female Sp5 -/- 199 Finished Pipeline DCC 20.5
J30548 2016-03-25 Female Sp5 -/- 199 Finished Pipeline DCC 15.9
J27624 2016-03-25 Male Dhx29 -/+ 199 Finished Pipeline DCC 20.2
J27636 2016-03-25 Female Dhx29 -/+ 199 Finished Pipeline DCC 31.1
J27637 2016-03-25 Female Dhx29 -/+ 199 Finished Pipeline DCC 35.2
J27620 2016-03-25 Female Dhx29 -/+ 199 Finished Pipeline DCC 16.6
J27626 2016-03-25 Male Dhx29 -/+ 199 Finished Pipeline DCC 15.5
J27639 2016-03-25 Female Dhx29 -/+ 199 Finished Pipeline DCC 18.1
J27621 2016-03-25 Female Dhx29 -/+ 199 Finished Pipeline DCC 22.9
J27622 2016-03-25 Female Dhx29 -/+ 199 Finished Pipeline DCC -14.3
J27640 2016-03-25 Male Dhx29 -/+ 199 Finished Pipeline DCC 32.9
J27641 2016-03-25 Male Dhx29 -/+ 199 Finished Pipeline DCC 10.3
J27623 2016-03-25 Female Dhx29 -/+ 199 Finished Pipeline DCC 2.5
J27642 2016-03-25 Male Dhx29 -/+ 199 Finished Pipeline DCC 10.4
J30549 2016-03-25 Female Foxred2 -/- 199 Finished Pipeline DCC 3.6
J30553 2016-03-25 Male Foxred2 -/- 199 Finished Pipeline DCC 27.3
J30550 2016-03-25 Female Foxred2 -/- 199 Finished Pipeline DCC 9.2
J30551 2016-03-25 Male Foxred2 -/- 199 Finished Pipeline DCC 12.5
J30552 2016-03-25 Male Foxred2 -/- 199 Finished Pipeline DCC -0.3
J29796 2016-03-25 Male Arpc5l -/- 199 Finished Pipeline DCC 4.9
J29806 2016-03-25 Female Arpc5l -/- 199 Finished Pipeline DCC 0.1
J27108 2016-03-25 Male Ccdc28a/2J -/- 199 Finished Pipeline DCC 11.8
J27110 2016-03-25 Male Ccdc28a/2J -/- 199 Finished Pipeline DCC 12.2
J29369 2016-03-18 Male Pcdh12 -/- 199 Finished Pipeline DCC 22.1
J27389 2016-03-18 Male Ptms -/+ 199 Finished Pipeline DCC 15.3
J27234 2016-03-18 Female Rad21l -/- 199 Finished Pipeline DCC -4.9
J27316 2016-03-18 Male Ncoa6 -/+ 199 Finished Pipeline DCC 9.6
J27317 2016-03-18 Male Ncoa6 -/+ 199 Finished Pipeline DCC -7.3
J27318 2016-03-18 Male Ncoa6 -/+ 199 Finished Pipeline DCC 20.8
J27324 2016-03-18 Male Ncoa6 -/+ 199 Finished Pipeline DCC 16.3
J25261 2016-03-18 Male Smoc2 -/- 199 Finished Pipeline DCC -6.5
J25262 2016-03-18 Male Smoc2 -/- 199 Finished Pipeline DCC 19.7
J27259 2016-03-18 Female Dbf4 -/+ 199 Finished Pipeline DCC 15.8
J27305 2016-03-18 Female Dbf4 -/+ 199 Finished Pipeline DCC 26.0
J27260 2016-03-18 Male Dbf4 -/+ 199 Finished Pipeline DCC 18.9
J27307 2016-03-18 Male Dbf4 -/+ 199 Finished Pipeline DCC 16.3
J26874 2016-03-18 Male Mlx -/- 199 Finished Pipeline DCC 7.6
J26859 2016-03-18 Female Mlx -/- 199 Finished Pipeline DCC 7.7
J26863 2016-03-18 Female Mlx -/- 199 Finished Pipeline DCC 9.0
J26876 2016-03-18 Female Mlx -/- 199 Finished Pipeline DCC 26.2
J26865 2016-03-18 Female Mlx -/- 199 Finished Pipeline DCC -2.5
J26880 2016-03-18 Male Mlx -/- 199 Finished Pipeline DCC 21.6
J26870 2016-03-18 Female Mlx -/- 199 Finished Pipeline DCC 11.5
J28818 2016-03-18 Female Ptpn20 -/- 199 Finished Pipeline DCC -18.4
J28819 2016-03-18 Female Ptpn20 -/- 199 Finished Pipeline DCC 4.8
J28826 2016-03-18 Male Ptpn20 -/- 199 Finished Pipeline DCC 37.9
J28820 2016-03-18 Female Ptpn20 -/- 199 Finished Pipeline DCC 21.8
J28821 2016-03-18 Female Ptpn20 -/- 199 Finished Pipeline DCC 22.9
J28824 2016-03-18 Male Ptpn20 -/- 199 Finished Pipeline DCC 5.5
J28822 2016-03-18 Female Ptpn20 -/- 199 Finished Pipeline DCC -4.2
J28825 2016-03-18 Female Ptpn20 -/- 199 Finished Pipeline DCC 16.7
J28823 2016-03-18 Male Ptpn20 -/- 199 Finished Pipeline DCC 25.2
J26930 2016-03-18 Female Ipo11 -/+ 199 Finished Pipeline DCC 15.0
J26885 2016-03-18 Female Cnih2 -/+ 199 Finished Pipeline DCC -9.1
J26892 2016-03-18 Male Cnih2 -/+ 199 Finished Pipeline DCC 11.0
J26887 2016-03-18 Female Cnih2 -/+ 199 Finished Pipeline DCC 21.4
J27440 2016-03-18 Female Bclaf1 -/+ 199 Finished Pipeline DCC 8.4
J27442 2016-03-18 Female Bclaf1 -/+ 199 Finished Pipeline DCC 13.4
J26625 2016-03-18 Male Ppp1r26 -/- 199 Finished Pipeline DCC 13.1
J25685 2016-03-18 Female Orc6 -/+ 199 Finished Pipeline DCC 26.2
J25686 2016-03-18 Female Orc6 -/+ 199 Finished Pipeline DCC 18.5
J26979 2016-03-18 Female Rbm4b -/- 199 Finished Pipeline DCC 25.6
J28863 2016-03-18 Female Spp1 -/- 199 Finished Pipeline DCC 19.5
J28864 2016-03-18 Female Spp1 -/- 199 Finished Pipeline DCC 20.5
J26588 2016-03-18 Female Spag4 -/- 199 Finished Pipeline DCC 27.8
J26592 2016-03-18 Male Spag4 -/- 199 Finished Pipeline DCC 25.4
J26594 2016-03-18 Male Spag4 -/- 199 Finished Pipeline DCC 3.1
J26595 2016-03-18 Male Spag4 -/- 199 Finished Pipeline DCC 23.3
J28024 2016-03-18 Male Adck5 -/- 199 Finished Pipeline DCC 19.9
J29525 2016-03-18 Female C57BL/6NJ 199 Finished Pipeline DCC 21.1
J29526 2016-03-18 Female C57BL/6NJ 199 Finished Pipeline DCC 20.1
J29530 2016-03-18 Male C57BL/6NJ 199 Finished Pipeline DCC 22.3
J29531 2016-03-18 Male C57BL/6NJ 199 Finished Pipeline DCC 7.4
J29527 2016-03-18 Female C57BL/6NJ 199 Finished Pipeline DCC 14.0
J29532 2016-03-18 Male C57BL/6NJ 199 Finished Pipeline DCC -19.2
J29528 2016-03-18 Female C57BL/6NJ 199 Finished Pipeline DCC 35.4
J29533 2016-03-18 Male C57BL/6NJ 199 Finished Pipeline DCC 7.2
J29529 2016-03-18 Female C57BL/6NJ 199 Finished Pipeline DCC 2.9
J29534 2016-03-18 Male C57BL/6NJ 199 Finished Pipeline DCC 18.8
J27851 2016-03-18 Female Pold2 -/+ 199 Finished Pipeline DCC 19.0
J27855 2016-03-18 Female Pold2 -/+ 199 Finished Pipeline DCC 30.9
J27859 2016-03-18 Male Pold2 -/+ 199 Finished Pipeline DCC -2.3
J27860 2016-03-18 Male Pold2 -/+ 199 Finished Pipeline DCC -6.4
J28827 2016-03-18 Female Tex29 -/- 199 Finished Pipeline DCC 30.0
J28828 2016-03-18 Female Tex29 -/- 199 Finished Pipeline DCC 22.3
J28829 2016-03-18 Female Tex29 -/- 199 Finished Pipeline DCC -3.6
J28833 2016-03-18 Male Tex29 -/- 199 Finished Pipeline DCC 27.8
J28834 2016-03-18 Male Tex29 -/- 199 Finished Pipeline DCC 19.9
J28830 2016-03-18 Female Tex29 -/- 199 Finished Pipeline DCC 20.2
J28831 2016-03-18 Female Tex29 -/- 199 Finished Pipeline DCC 22.9
J28832 2016-03-18 Female Tex29 -/- 199 Finished Pipeline DCC 22.3
J28090 2016-03-18 Female Rap2b -/- 199 Finished Pipeline DCC 30.9
J28091 2016-03-18 Male Rap2b -/- 199 Finished Pipeline DCC 11.3
J26893 2016-03-18 Female Gpr156 -/- 199 Finished Pipeline DCC -1.4
J26895 2016-03-18 Male Gpr156 -/- 199 Finished Pipeline DCC 8.2
J26894 2016-03-18 Female Gpr156 -/- 199 Finished Pipeline DCC 13.5
J26911 2016-03-18 Male Gpr156 -/- 199 Finished Pipeline DCC 13.0
J26896 2016-03-18 Male Gpr156 -/- 199 Finished Pipeline DCC 8.6
J26907 2016-03-18 Male Gpr156 -/- 199 Finished Pipeline DCC 0.0
J26912 2016-03-18 Male Gpr156 -/- 199 Finished Pipeline DCC -4.4
J29400 2016-03-18 Female Ifnk -/- 199 Finished Pipeline DCC 33.7
J29403 2016-03-18 Female Ifnk -/- 199 Finished Pipeline DCC 12.5
J29402 2016-03-18 Male Ifnk -/- 199 Finished Pipeline DCC 16.3
J29404 2016-03-18 Female Ifnk -/- 199 Finished Pipeline DCC 17.8
J29407 2016-03-18 Male Ifnk -/- 199 Finished Pipeline DCC 14.2
J29405 2016-03-18 Female Ifnk -/- 199 Finished Pipeline DCC 0.7
J29406 2016-03-18 Female Ifnk -/- 199 Finished Pipeline DCC 8.1
J29409 2016-03-18 Male Ifnk -/- 199 Finished Pipeline DCC 10.8
J29408 2016-03-18 Male Ifnk -/- 199 Finished Pipeline DCC 22.1
J26965 2016-03-18 Male Myo3a -/- 199 Finished Pipeline DCC 20.6
J29410 2016-03-18 Female Myo3a -/- 199 Finished Pipeline DCC 15.3
J26969 2016-03-18 Male Myo3a -/- 199 Finished Pipeline DCC 17.7
J29411 2016-03-18 Female Myo3a -/- 199 Finished Pipeline DCC 15.8
J26962 2016-03-18 Female Myo3a -/- 199 Finished Pipeline DCC 7.2
J29412 2016-03-18 Female Myo3a -/- 199 Finished Pipeline DCC 20.0
J29413 2016-03-18 Female Myo3a -/- 199 Finished Pipeline DCC 1.9
J29414 2016-03-18 Male Myo3a -/- 199 Finished Pipeline DCC 21.0
J25991 2016-03-18 Male Satb1 -/+ 199 Finished Pipeline DCC 13.3
J26929 2016-03-18 Male Ap4e1 -/- 199 Finished Pipeline DCC 4.8
J26927 2016-03-18 Male Ap4e1 -/- 199 Finished Pipeline DCC 13.9
J26415 2016-03-18 Female Gpr19 -/- 199 Finished Pipeline DCC 20.9
J26422 2016-03-18 Male Gpr19 -/- 199 Finished Pipeline DCC 19.4
J26922 2016-03-18 Female Ap4e1 -/- 199 Finished Pipeline DCC 14.4
J26925 2016-03-18 Female Ap4e1 -/- 199 Finished Pipeline DCC -0.6
J26948 2016-03-04 Female C57BL/6NJ 199 Finished Pipeline DCC 21.7
J26949 2016-03-04 Female C57BL/6NJ 199 Finished Pipeline DCC -2.3
J26953 2016-03-04 Male C57BL/6NJ 199 Finished Pipeline DCC -0.6
J26954 2016-03-04 Male C57BL/6NJ 199 Finished Pipeline DCC 38.4
J26950 2016-03-04 Female C57BL/6NJ 199 Finished Pipeline DCC 25.6
J26955 2016-03-04 Male C57BL/6NJ 199 Finished Pipeline DCC 27.1
J26951 2016-03-04 Female C57BL/6NJ 199 Finished Pipeline DCC -13.6
J26956 2016-03-04 Male C57BL/6NJ 199 Finished Pipeline DCC 17.1
J26952 2016-03-04 Female C57BL/6NJ 199 Finished Pipeline DCC 12.8
J26957 2016-03-04 Male C57BL/6NJ 199 Finished Pipeline DCC 6.3
J27013 2016-03-04 Female C57BL/6NJ 199 Finished Pipeline DCC 11.1
J27014 2016-03-04 Female C57BL/6NJ 199 Finished Pipeline DCC -3.9
J27018 2016-03-04 Male C57BL/6NJ 199 Finished Pipeline DCC 13.1
J27019 2016-03-04 Male C57BL/6NJ 199 Finished Pipeline DCC 18.8
J27015 2016-03-04 Female C57BL/6NJ 199 Finished Pipeline DCC 20.7
J27020 2016-03-04 Male C57BL/6NJ 199 Finished Pipeline DCC 30.7
J27016 2016-03-04 Female C57BL/6NJ 199 Finished Pipeline DCC 24.5
J27021 2016-03-04 Male C57BL/6NJ 199 Finished Pipeline DCC 22.8
J27017 2016-03-04 Female C57BL/6NJ 199 Finished Pipeline DCC 21.2
J27022 2016-03-04 Male C57BL/6NJ 199 Finished Pipeline DCC 14.1
J24151 2016-03-04 Male Ube2m/2J -/+ 199 Finished Pipeline DCC 24.4
J26916 2016-03-04 Male Serpina7 -/Y 199 Finished Pipeline DCC 17.5
J26914 2016-03-04 Female Serpina7 -/- 199 Finished Pipeline DCC 10.9
J26918 2016-03-04 Male Serpina7 -/Y 199 Finished Pipeline DCC 20.5
J26915 2016-03-04 Male Serpina7 -/Y 199 Finished Pipeline DCC 21.4
J26917 2016-03-04 Male Serpina7 -/Y 199 Finished Pipeline DCC 12.5
J24135 2016-03-04 Female Dolk -/+ 199 Finished Pipeline DCC 24.5
J24085 2016-03-04 Male Fastkd5 -/- 199 Finished Pipeline DCC 22.9
J24093 2016-03-04 Female Dnajc7 -/- 199 Finished Pipeline DCC 18.3
J24098 2016-03-04 Male Dnajc7 -/- 199 Finished Pipeline DCC 39.0
J24706 2016-03-04 Female Rad1 -/+ 199 Finished Pipeline DCC 0.2
J24707 2016-03-04 Female Rad1 -/+ 199 Finished Pipeline DCC 30.3
J24708 2016-03-04 Female Rad1 -/+ 199 Finished Pipeline DCC 24.2
J24544 2016-03-04 Female Spink12 -/- 199 Finished Pipeline DCC 29.3
J23114 2016-03-04 Female Ppp1r26 -/- 199 Finished Pipeline DCC -14.0
J23115 2016-03-04 Female Ppp1r26 -/- 199 Finished Pipeline DCC 23.0
J23241 2016-03-04 Female Bbox1 -/- 199 Finished Pipeline DCC 19.3
J23242 2016-03-04 Female Bbox1 -/- 199 Finished Pipeline DCC 17.9
J23243 2016-03-04 Female Bbox1 -/- 199 Finished Pipeline DCC 5.5
J23244 2016-03-04 Female Bbox1 -/- 199 Finished Pipeline DCC 37.9
J23245 2016-03-04 Male Bbox1 -/- 199 Finished Pipeline DCC 26.4
J23246 2016-03-04 Male Bbox1 -/- 199 Finished Pipeline DCC 11.4
J23247 2016-03-04 Male Bbox1 -/- 199 Finished Pipeline DCC 36.9
J23248 2016-03-04 Male Bbox1 -/- 199 MSG DCC 23.7
J26503 2016-03-04 Female Adck5 -/- 199 Finished Pipeline DCC 18.3
J26504 2016-03-04 Male Adck5 -/- 199 Finished Pipeline DCC 13.5
J26505 2016-03-04 Male Adck5 -/- 199 Finished Pipeline DCC 6.5
J26506 2016-03-04 Male Adck5 -/- 199 Finished Pipeline DCC 17.3
J26508 2016-03-04 Male Adck5 -/- 199 Finished Pipeline DCC 25.2
J25910 2016-03-04 Female Gpr142 -/- 199 Finished Pipeline DCC 15.7
J25880 2016-03-04 Male Nrsn1 -/- 199 Finished Pipeline DCC 50.1
J25881 2016-03-04 Male Nrsn1 -/- 199 Finished Pipeline DCC 5.9
J25882 2016-03-04 Male Nrsn1 -/- 199 Finished Pipeline DCC 11.7
J25883 2016-03-04 Male Nrsn1 -/- 199 Finished Pipeline DCC 38.6
J26369 2016-03-04 Female Oard1 -/- 199 Finished Pipeline DCC 33.2
J26370 2016-03-04 Female Oard1 -/- 199 Finished Pipeline DCC 44.3
J25752 2016-03-04 Female Nt5c -/- 199 Finished Pipeline DCC 6.1
J25753 2016-03-04 Female Nt5c -/- 199 Finished Pipeline DCC 18.8
J26848 2016-03-04 Female Rexo4 -/- 199 Finished Pipeline DCC 20.7
J26849 2016-03-04 Female Rexo4 -/- 199 Finished Pipeline DCC 23.5
J24420 2016-03-04 Female Mtmr3 -/- 199 Finished Pipeline DCC 24.0
J24434 2016-03-04 Female Mtmr3 -/- 199 Finished Pipeline DCC 26.0
J24426 2016-03-04 Male Mtmr3 -/- 199 Finished Pipeline DCC 44.2
J24436 2016-03-04 Male Mtmr3 -/- 199 Finished Pipeline DCC 22.4
J24247 2016-03-04 Female Pola2 -/+ 199 Finished Pipeline DCC 10.1
J24248 2016-03-04 Female Pola2 -/+ 199 Finished Pipeline DCC 9.8
J24251 2016-03-04 Male Pola2 -/+ 199 Finished Pipeline DCC 32.4
J24252 2016-03-04 Male Pola2 -/+ 199 Finished Pipeline DCC 22.8
J24249 2016-03-04 Female Pola2 -/+ 199 Finished Pipeline DCC 12.2
J24250 2016-03-04 Female Pola2 -/+ 199 Finished Pipeline DCC 10.7
J24209 2016-03-04 Male Pola2 -/+ 199 Finished Pipeline DCC 23.9
J24205 2016-03-04 Female Pola2 -/+ 199 Finished Pipeline DCC 24.2
J24211 2016-03-04 Male Pola2 -/+ 199 Finished Pipeline DCC 19.0
J24232 2016-03-04 Female Pola2 -/+ 199 Finished Pipeline DCC 5.9
J24233 2016-03-04 Female Pola2 -/+ 199 Finished Pipeline DCC 31.6
J24235 2016-03-04 Female Pola2 -/+ 199 Finished Pipeline DCC 17.6
J24238 2016-03-04 Male Pola2 -/+ 199 Finished Pipeline DCC 21.0
J24240 2016-03-04 Male Pola2 -/+ 199 Finished Pipeline DCC 22.4
J25161 2016-03-04 Female R3hcc1l -/- 199 Finished Pipeline DCC 32.3
J25165 2016-03-04 Female R3hcc1l -/- 199 Finished Pipeline DCC 15.3
J25174 2016-03-04 Male R3hcc1l -/- 199 Finished Pipeline DCC 21.2
J25164 2016-03-04 Male R3hcc1l -/- 199 Finished Pipeline DCC 23.3
J25173 2016-03-04 Male R3hcc1l -/- 199 Finished Pipeline DCC 29.8
J24488 2016-03-04 Female Serpina1f -/- 199 Finished Pipeline DCC 6.8
J24520 2016-03-04 Male Serpina1f -/- 199 Finished Pipeline DCC 16.0
J24489 2016-03-04 Female Serpina1f -/- 199 Finished Pipeline DCC 32.6
J24491 2016-03-04 Female Serpina1f -/- 199 Finished Pipeline DCC 27.3
J24517 2016-03-04 Female Serpina1f -/- 199 Finished Pipeline DCC 24.9
J25583 2016-03-04 Female Cyp2u1 -/- 199 Finished Pipeline DCC 21.9
J25562 2016-03-04 Female Cyp2u1 -/- 199 Finished Pipeline DCC 19.9
J25606 2016-03-04 Male Cyp2u1 -/- 199 Finished Pipeline DCC 25.0
J25599 2016-03-04 Female Cyp2u1 -/- 199 Finished Pipeline DCC 11.9
J25056 2016-03-04 Male Sp5 -/+ 199 Finished Pipeline DCC 27.2
J25054 2016-03-04 Female Sp5 -/+ 199 Finished Pipeline DCC 29.7
J24260 2016-03-04 Female Lrch1 -/- 199 Finished Pipeline DCC 6.0
J24279 2016-03-04 Male Lrch1 -/- 199 Finished Pipeline DCC 28.9
J24277 2016-03-04 Male Lrch1 -/- 199 Finished Pipeline DCC 18.1
J24310 2016-03-04 Male Lrch1 -/- 199 Finished Pipeline DCC 24.9
J24313 2016-03-04 Male Lrch1 -/- 199 Finished Pipeline DCC 26.7
J24971 2016-02-25 Female Cdk19 -/+ 199 Finished Pipeline DCC 8.5
J24972 2016-02-25 Female Cdk19 -/+ 199 Finished Pipeline DCC 11.0
J22212 2016-02-25 Male Masp1 -/- 199 Finished Pipeline DCC 19.3
J25001 2016-02-25 Female Pcdh12 -/- 199 Finished Pipeline DCC 2.8
J25002 2016-02-25 Female Pcdh12 -/- 199 Finished Pipeline DCC 16.4
J22086 2016-02-25 Female Ncoa6 -/+ 199 Finished Pipeline DCC 16.3
J22087 2016-02-25 Male Ncoa6 -/+ 199 Finished Pipeline DCC 13.9
J22088 2016-02-25 Male Ncoa6 -/+ 199 Finished Pipeline DCC 19.0
J22083 2016-02-25 Female Ncoa6 -/+ 199 Finished Pipeline DCC -10.8
J22084 2016-02-25 Female Ncoa6 -/+ 199 Finished Pipeline DCC 20.3
J23132 2016-02-25 Female Ilk -/+ 199 Finished Pipeline DCC 32.7
J21384 2016-02-25 Female Chn1 -/+ 199 Finished Pipeline DCC 10.8
J21452 2016-02-25 Female Pold2 -/+ 199 Finished Pipeline DCC 25.1
J21453 2016-02-25 Female Pold2 -/+ 199 Finished Pipeline DCC 16.7
J22589 2016-02-25 Female Mcm4/2J -/+ 199 Finished Pipeline DCC 20.9
J22590 2016-02-25 Male Mcm4/2J -/+ 199 Finished Pipeline DCC 6.6
J22591 2016-02-25 Male Mcm4/2J -/+ 199 Found Dead DCC 21.6
J22592 2016-02-25 Male Mcm4/2J -/+ 199 Finished Pipeline DCC 24.9
J22593 2016-02-25 Male Mcm4/2J -/+ 199 Finished Pipeline DCC 20.4
J22597 2016-02-25 Male Mcm4/2J -/+ 199 Finished Pipeline DCC 10.7
J22598 2016-02-25 Male Mcm4/2J -/+ 199 None DCC 37.4
J22599 2016-02-25 Male Mcm4/2J -/+ 199 Finished Pipeline DCC 11.8
J22376 2016-02-25 Female Rps6kl1 -/- 199 Finished Pipeline DCC 19.0
J24181 2016-02-25 Female Pard6a -/- 199 Finished Pipeline DCC 32.2
J24182 2016-02-25 Female Pard6a -/- 199 Finished Pipeline DCC 15.9
J24184 2016-02-25 Male Pard6a -/- 199 Finished Pipeline DCC 27.1
J24185 2016-02-25 Male Pard6a -/- 199 Finished Pipeline DCC 14.4
J24183 2016-02-25 Female Pard6a -/- 199 Finished Pipeline DCC 14.0
J24186 2016-02-25 Male Pard6a -/- 199 Finished Pipeline DCC 11.7
J24187 2016-02-25 Male Pard6a -/- 199 Finished Pipeline DCC 15.0
J24189 2016-02-25 Female Pard6a -/- 199 Finished Pipeline DCC 16.6
J24188 2016-02-25 Male Pard6a -/- 199 Finished Pipeline DCC 13.9
J24190 2016-02-25 Female Pard6a -/- 199 Finished Pipeline DCC 27.1
J24191 2016-02-25 Male Pard6a -/- 199 Finished Pipeline DCC 16.6
J24192 2016-02-25 Male Pard6a -/- 199 Finished Pipeline DCC 12.0
J24193 2016-02-25 Male Pard6a -/- 199 Finished Pipeline DCC 32.0
J23209 2016-02-25 Female Rad1 -/+ 199 Finished Pipeline DCC -4.9
J23210 2016-02-25 Female Rad1 -/+ 199 Finished Pipeline DCC 18.4
J23211 2016-02-25 Male Rad1 -/+ 199 Finished Pipeline DCC 19.1
J23212 2016-02-25 Male Rad1 -/+ 199 Finished Pipeline DCC 24.2
J23213 2016-02-25 Male Rad1 -/+ 199 Finished Pipeline DCC 17.6
J23214 2016-02-25 Male Rad1 -/+ 199 Finished Pipeline DCC 13.0
J21556 2016-02-25 Female Adck5 -/- 199 Finished Pipeline DCC 21.8
J21557 2016-02-25 Female Adck5 -/- 199 Finished Pipeline DCC 28.1
J21559 2016-02-25 Female Adck5 -/- 199 Finished Pipeline DCC 16.4
J22177 2016-02-25 Female Tpr -/+ 199 Finished Pipeline DCC 17.4
J22178 2016-02-25 Female Tpr -/+ 199 Finished Pipeline DCC 13.4
J22181 2016-02-25 Male Tpr -/+ 199 Finished Pipeline DCC 7.0
J22183 2016-02-25 Male Tpr -/+ 199 Finished Pipeline DCC 7.9
J22179 2016-02-25 Female Tpr -/+ 199 Finished Pipeline DCC 11.1
J24604 2016-02-25 Female Foxred2 -/- 199 Finished Pipeline DCC 12.5
J24605 2016-02-25 Female Foxred2 -/- 199 Finished Pipeline DCC 31.8
J24606 2016-02-25 Male Foxred2 -/- 199 Finished Pipeline DCC 20.0
J24162 2016-02-25 Female Iqgap2 -/- 199 Finished Pipeline DCC 7.5
J24163 2016-02-25 Female Iqgap2 -/- 199 Finished Pipeline DCC 11.7
J24165 2016-02-25 Male Iqgap2 -/- 199 Finished Pipeline DCC 29.5
J24166 2016-02-25 Male Iqgap2 -/- 199 Finished Pipeline DCC 10.1
J21518 2016-02-25 Female Spink12 -/- 199 Finished Pipeline DCC 15.1
J21522 2016-02-25 Male Spink12 -/- 199 Finished Pipeline DCC 12.7
J22258 2016-02-25 Female Mos -/- 199 Finished Pipeline DCC 20.4
J24568 2016-02-25 Male Tpcn1 -/- 199 Finished Pipeline DCC 26.4
J24569 2016-02-25 Male Tpcn1 -/- 199 Finished Pipeline DCC 9.0
J24570 2016-02-25 Male Tpcn1 -/- 199 Finished Pipeline DCC 19.1
J24571 2016-02-25 Male Tpcn1 -/- 199 Finished Pipeline DCC 7.0
J24572 2016-02-25 Male Tpcn1 -/- 199 Finished Pipeline DCC 18.6
J25402 2016-02-25 Female C57BL/6NJ 199 Finished Pipeline DCC 16.6
J25403 2016-02-25 Female C57BL/6NJ 199 Finished Pipeline DCC 20.6
J25407 2016-02-25 Male C57BL/6NJ 199 Finished Pipeline DCC 19.7
J25408 2016-02-25 Male C57BL/6NJ 199 Finished Pipeline DCC 34.5
J25404 2016-02-25 Female C57BL/6NJ 199 Finished Pipeline DCC 17.8
J25409 2016-02-25 Male C57BL/6NJ 199 Finished Pipeline DCC 15.2
J25405 2016-02-25 Female C57BL/6NJ 199 Finished Pipeline DCC 23.1
J25410 2016-02-25 Male C57BL/6NJ 199 Finished Pipeline DCC 16.7
J25406 2016-02-25 Female C57BL/6NJ 199 Finished Pipeline DCC -6.4
J25411 2016-02-25 Male C57BL/6NJ 199 Finished Pipeline DCC -16.1
J25392 2016-02-25 Female C57BL/6NJ 199 Finished Pipeline DCC 14.1
J25393 2016-02-25 Female C57BL/6NJ 199 Finished Pipeline DCC 13.9
J25397 2016-02-25 Male C57BL/6NJ 199 Finished Pipeline DCC 13.2
J25398 2016-02-25 Male C57BL/6NJ 199 Finished Pipeline DCC 16.6
J25394 2016-02-25 Female C57BL/6NJ 199 Finished Pipeline DCC 15.9
J25399 2016-02-25 Male C57BL/6NJ 199 Finished Pipeline DCC 16.8
J25395 2016-02-25 Female C57BL/6NJ 199 Finished Pipeline DCC 18.3
J25400 2016-02-25 Male C57BL/6NJ 199 Finished Pipeline DCC 24.7
J25396 2016-02-25 Female C57BL/6NJ 199 Finished Pipeline DCC 17.9
J25401 2016-02-25 Male C57BL/6NJ 199 Finished Pipeline DCC 13.4
J23406 2016-02-25 Male Spag4 -/- 199 Finished Pipeline DCC 20.4
J23407 2016-02-25 Male Spag4 -/- 199 Finished Pipeline DCC 24.4
J24107 2016-02-25 Male Wdr36/2J -/+ 199 Finished Pipeline DCC 30.1
J22957 2016-02-25 Male Agpat1 -/+ 199 Finished Pipeline DCC 12.5
J22959 2016-02-25 Male Agpat1 -/+ 199 Finished Pipeline DCC 19.3
J23110 2016-02-25 Male Ppp1r26 -/- 199 Finished Pipeline DCC 17.4
J24564 2016-02-25 Female Lcn2 -/- 199 Finished Pipeline DCC -3.8
J24565 2016-02-25 Female Lcn2 -/- 199 Finished Pipeline DCC -20.1
J24566 2016-02-25 Female Lcn2 -/- 199 Finished Pipeline DCC 19.7
J25022 2016-02-25 Male Dnaja4 -/- 199 Finished Pipeline DCC 0.6
J25023 2016-02-25 Male Dnaja4 -/- 199 Finished Pipeline DCC 11.8
J24567 2016-02-25 Male Lcn2 -/- 199 Finished Pipeline DCC 16.3
J25116 2016-02-25 Male Ypel1 -/- 199 Finished Pipeline DCC 14.8
J25117 2016-02-25 Male Ypel1 -/- 199 Finished Pipeline DCC 17.3
J25118 2016-02-25 Male Ypel1 -/- 199 Finished Pipeline DCC 4.8
J23139 2016-02-25 Male Ilk -/+ 199 Finished Pipeline DCC 22.6
J24152 2016-02-19 Female C57BL/6NJ 199 Finished Pipeline DCC 9.2
J24153 2016-02-19 Female C57BL/6NJ 199 Finished Pipeline DCC 41.9
J24157 2016-02-19 Male C57BL/6NJ 199 Finished Pipeline DCC 28.1
J24158 2016-02-19 Male C57BL/6NJ 199 Finished Pipeline DCC 4.2
J24154 2016-02-19 Female C57BL/6NJ 199 Finished Pipeline DCC -6.1
J24159 2016-02-19 Male C57BL/6NJ 199 Finished Pipeline DCC 27.2
J24155 2016-02-19 Female C57BL/6NJ 199 Finished Pipeline DCC 12.0
J24160 2016-02-19 Male C57BL/6NJ 199 Finished Pipeline DCC 9.7
J24156 2016-02-19 Female C57BL/6NJ 199 Finished Pipeline DCC 21.7
J24161 2016-02-19 Male C57BL/6NJ 199 Finished Pipeline DCC 17.0
J24123 2016-02-19 Female C57BL/6NJ 199 Finished Pipeline DCC 7.2
J24124 2016-02-19 Female C57BL/6NJ 199 Finished Pipeline DCC 13.0
J24128 2016-02-19 Male C57BL/6NJ 199 Finished Pipeline DCC 6.2
J24129 2016-02-19 Male C57BL/6NJ 199 Finished Pipeline DCC 4.0
J24125 2016-02-19 Female C57BL/6NJ 199 Finished Pipeline DCC 18.8
J24130 2016-02-19 Male C57BL/6NJ 199 Finished Pipeline DCC -1.0
J24126 2016-02-19 Female C57BL/6NJ 199 Finished Pipeline DCC 23.1
J24131 2016-02-19 Male C57BL/6NJ 199 Found Dead DCC 12.2
J24127 2016-02-19 Female C57BL/6NJ 199 Finished Pipeline DCC 15.1
J24132 2016-02-19 Male C57BL/6NJ 199 Finished Pipeline DCC 1.1
J23973 2016-02-19 Male Mpdz -/- 199 Finished Pipeline DCC 10.7
J23974 2016-02-19 Male Mpdz -/- 199 Finished Pipeline DCC 9.7
J23930 2016-02-19 Female Pcdh12 -/- 199 Finished Pipeline DCC 22.0
J23935 2016-02-19 Male Pcdh12 -/- 199 Finished Pipeline DCC -30.1
J23931 2016-02-19 Female Pcdh12 -/- 199 Finished Pipeline DCC 15.8
J23934 2016-02-19 Female Pcdh12 -/- 199 Finished Pipeline DCC 14.6
J23932 2016-02-19 Female Pcdh12 -/- 199 Finished Pipeline DCC 16.5
J23936 2016-02-19 Male Pcdh12 -/- 199 Other DCC 5.2
J23933 2016-02-19 Female Pcdh12 -/- 199 Finished Pipeline DCC 24.9
J21926 2016-02-19 Female Stat5b -/- 199 Other DCC 14.3
J23231 2016-02-19 Female Bmp2k -/- 199 Finished Pipeline DCC 23.8
J23235 2016-02-19 Female Bmp2k -/- 199 Finished Pipeline DCC 21.4
J23232 2016-02-19 Female Bmp2k -/- 199 Finished Pipeline DCC 24.4
J23233 2016-02-19 Female Bmp2k -/- 199 Finished Pipeline DCC 36.7
J23234 2016-02-19 Female Bmp2k -/- 199 Finished Pipeline DCC 35.4
J20223 2016-02-19 Male Ltbp2 -/- 199 Finished Pipeline DCC 6.8
J20246 2016-02-19 Female Ltbp2 -/- 199 Finished Pipeline DCC -3.2
J20253 2016-02-19 Male Ltbp2 -/- 199 Finished Pipeline DCC 37.4
J21375 2016-02-19 Female Ltbp2 -/- 199 Finished Pipeline DCC 27.1
J20250 2016-02-19 Male Ltbp2 -/- 199 Finished Pipeline DCC 0.9
J20251 2016-02-19 Male Ltbp2 -/- 199 Finished Pipeline DCC 10.7
J21379 2016-02-19 Male Ltbp2 -/- 199 Finished Pipeline DCC 0.6
J21381 2016-02-19 Male Ltbp2 -/- 199 Finished Pipeline DCC 19.3
J21382 2016-02-19 Male Ltbp2 -/- 199 Finished Pipeline DCC 12.9
J21734 2016-02-19 Female Car12/2J -/- 199 Finished Pipeline DCC 25.9
J21765 2016-02-19 Male Car12/2J -/- 199 Finished Pipeline DCC 24.8
J21735 2016-02-19 Female Car12/2J -/- 199 Finished Pipeline DCC 13.1
J21739 2016-02-19 Male Car12/2J -/- 199 Finished Pipeline DCC -3.6
J21736 2016-02-19 Female Car12/2J -/- 199 Finished Pipeline DCC 14.4
J21737 2016-02-19 Male Car12/2J -/- 199 Finished Pipeline DCC 20.1
J21738 2016-02-19 Male Car12/2J -/- 199 Finished Pipeline DCC 21.8
J21759 2016-02-19 Female Car12/2J -/- 199 Finished Pipeline DCC -8.8
J21768 2016-02-19 Female Car12/2J -/- 199 Finished Pipeline DCC 20.2
J20072 2016-02-19 Male Gpr19 -/- 199 Finished Pipeline DCC 17.7
J20074 2016-02-19 Male Gpr19 -/- 199 Finished Pipeline DCC -0.3
J21394 2016-02-19 Male Wdr36/2J -/+ 199 Finished Pipeline DCC -15.2
J21396 2016-02-19 Male Wdr36/2J -/+ 199 Finished Pipeline DCC -3.2
J20914 2016-02-19 Female Spag4 -/- 199 Finished Pipeline DCC 16.2
J20915 2016-02-19 Female Spag4 -/- 199 Finished Pipeline DCC 19.6
J20916 2016-02-19 Female Spag4 -/- 199 Finished Pipeline DCC 29.0
J20900 2016-02-19 Female Rnf13 -/- 199 Finished Pipeline DCC 27.4
J20901 2016-02-19 Female Rnf13 -/- 199 Finished Pipeline DCC 23.2
J20902 2016-02-19 Female Rnf13 -/- 199 Finished Pipeline DCC 2.2
J21330 2016-02-19 Male Plekha3 -/- 199 Finished Pipeline DCC 12.5
J21345 2016-02-19 Female Plekha3 -/- 199 Finished Pipeline DCC 26.5
J21331 2016-02-19 Male Plekha3 -/- 199 Finished Pipeline DCC 20.7
J21346 2016-02-19 Female Plekha3 -/- 199 Finished Pipeline DCC 25.9
J21365 2016-02-19 Male Plekha3 -/- 199 Finished Pipeline DCC 10.6
J21369 2016-02-19 Male Plekha3 -/- 199 Other DCC 18.8
J23019 2016-02-19 Female Theg -/+ 199 Finished Pipeline DCC -14.5
J23021 2016-02-19 Male Theg -/+ 199 Finished Pipeline DCC 2.6
J21316 2016-02-19 Female Satb1 -/+ 199 Finished Pipeline DCC 8.0
J21317 2016-02-19 Female Satb1 -/+ 199 Finished Pipeline DCC 41.3
J21322 2016-02-19 Male Satb1 -/+ 199 Finished Pipeline DCC 22.6
J21318 2016-02-19 Female Satb1 -/+ 199 Finished Pipeline DCC 23.0
J21319 2016-02-19 Female Satb1 -/+ 199 Finished Pipeline DCC 18.7
J22348 2016-02-19 Female Fitm2 -/+ 199 Finished Pipeline DCC 8.7
J24025 2016-02-19 Female Iqgap2 -/- 199 Finished Pipeline DCC 15.5
J24030 2016-02-19 Male Iqgap2 -/- 199 Finished Pipeline DCC 20.3
J24026 2016-02-19 Female Iqgap2 -/- 199 Finished Pipeline DCC -17.3
J24029 2016-02-19 Male Iqgap2 -/- 199 Finished Pipeline DCC 43.6
J24027 2016-02-19 Female Iqgap2 -/- 199 Finished Pipeline DCC 2.6
J21410 2016-02-19 Male Pcgf1 -/+ 199 Finished Pipeline DCC 36.1
J21413 2016-02-19 Male Pcgf1 -/+ 199 Finished Pipeline DCC -13.6
J21418 2016-02-19 Female Pcgf1 -/+ 199 Finished Pipeline DCC 18.7
J21419 2016-02-19 Female Pcgf1 -/+ 199 Finished Pipeline DCC 4.9
J21400 2016-02-19 Male Pcgf1 -/+ 199 Finished Pipeline DCC 23.0
J21420 2016-02-19 Female Pcgf1 -/+ 199 Finished Pipeline DCC 6.2
J21426 2016-02-19 Female Pcgf1 -/+ 199 Finished Pipeline DCC 6.5
J21428 2016-02-19 Male Pcgf1 -/+ 199 Finished Pipeline DCC 10.7
J21399 2016-02-19 Female Pcgf1 -/+ 199 Finished Pipeline DCC -0.3
J21401 2016-02-19 Male Pcgf1 -/+ 199 Finished Pipeline DCC 22.7
J21402 2016-02-19 Male Pcgf1 -/+ 199 Finished Pipeline DCC 7.2
J21405 2016-02-19 Female Pcgf1 -/+ 199 Finished Pipeline DCC 25.7
J21403 2016-02-19 Male Pcgf1 -/+ 199 Finished Pipeline DCC -1.7
J21404 2016-02-19 Male Pcgf1 -/+ 199 Finished Pipeline DCC 9.7
J21407 2016-02-19 Female Pcgf1 -/+ 199 Finished Pipeline DCC 20.5
J21409 2016-02-19 Female Pcgf1 -/+ 199 Finished Pipeline DCC 11.3
J21481 2016-02-19 Female Grcc10 -/+ 199 Finished Pipeline DCC 15.5
J21485 2016-02-19 Male Grcc10 -/+ 199 Finished Pipeline DCC 14.7
J21482 2016-02-19 Female Grcc10 -/+ 199 Finished Pipeline DCC 33.2
J21483 2016-02-19 Male Grcc10 -/+ 199 Finished Pipeline DCC 6.5
J21486 2016-02-19 Male Grcc10 -/+ 199 Finished Pipeline DCC 20.1
J21142 2016-02-19 Female Tas2r138 -/- 199 Finished Pipeline DCC 26.8
J21143 2016-02-19 Female Tas2r138 -/- 199 Finished Pipeline DCC 20.0
J20214 2016-02-12 Male Htr1f -/- 199 Finished Pipeline DCC 27.8
J20215 2016-02-12 Male Htr1f -/- 199 Finished Pipeline DCC 12.9
J23154 2016-02-12 Female Bmp2k -/- 199 Finished Pipeline DCC 24.3
J23155 2016-02-12 Male Bmp2k -/- 199 Finished Pipeline DCC 6.2
J23173 2016-02-12 Female C57BL/6NJ 199 Finished Pipeline DCC 14.0
J23174 2016-02-12 Female C57BL/6NJ 199 Finished Pipeline DCC 11.3
J23178 2016-02-12 Male C57BL/6NJ 199 Finished Pipeline DCC 0.9
J23179 2016-02-12 Male C57BL/6NJ 199 Finished Pipeline DCC 32.7
J23175 2016-02-12 Female C57BL/6NJ 199 Finished Pipeline DCC 18.8
J23180 2016-02-12 Male C57BL/6NJ 199 Finished Pipeline DCC 11.4
J23176 2016-02-12 Female C57BL/6NJ 199 Finished Pipeline DCC 12.5
J23181 2016-02-12 Male C57BL/6NJ 199 Finished Pipeline DCC 20.1
J23177 2016-02-12 Female C57BL/6NJ 199 Finished Pipeline DCC 15.9
J23182 2016-02-12 Male C57BL/6NJ 199 Finished Pipeline DCC 4.1
J22917 2016-02-12 Female C57BL/6NJ 199 Finished Pipeline DCC -10.3
J22918 2016-02-12 Female C57BL/6NJ 199 Finished Pipeline DCC 26.3
J22923 2016-02-12 Male C57BL/6NJ 199 Finished Pipeline DCC 19.2
J22924 2016-02-12 Male C57BL/6NJ 199 Finished Pipeline DCC 8.7
J22919 2016-02-12 Female C57BL/6NJ 199 Finished Pipeline DCC 30.3
J22925 2016-02-12 Male C57BL/6NJ 199 Finished Pipeline DCC 30.2
J22920 2016-02-12 Female C57BL/6NJ 199 Finished Pipeline DCC 29.2
J22926 2016-02-12 Male C57BL/6NJ 199 Finished Pipeline DCC 4.5
J19973 2016-02-12 Male Ptms -/+ 199 Finished Pipeline DCC 22.5
J20030 2016-02-12 Female Ncoa6 -/+ 199 Finished Pipeline DCC 0.4
J20033 2016-02-12 Male Ncoa6 -/+ 199 Finished Pipeline DCC 20.9
J20035 2016-02-12 Female Ncoa6 -/+ 199 Finished Pipeline DCC 29.3
J20036 2016-02-12 Male Ncoa6 -/+ 199 Finished Pipeline DCC 10.9
J20052 2016-02-12 Female Ncoa6 -/+ 199 Finished Pipeline DCC 22.0
J20053 2016-02-12 Female Ncoa6 -/+ 199 Finished Pipeline DCC 22.7
J20181 2016-02-12 Male Ift88 -/+ 199 Finished Pipeline DCC 14.0
J20151 2016-02-12 Male Ubn1 -/- 199 Finished Pipeline DCC 20.8
J20237 2016-02-12 Male Ube2m/2J -/+ 199 Finished Pipeline DCC 1.3
J20238 2016-02-12 Male Ube2m/2J -/+ 199 Finished Pipeline DCC 12.3
J23162 2016-02-12 Male Klk14 -/- 199 Finished Pipeline DCC 21.1
J18435 2016-02-12 Male Cyp2u1 -/- 199 Finished Pipeline DCC -2.5
J20131 2016-02-12 Male Aurka -/+ 199 Finished Pipeline DCC 3.0
J20280 2016-02-12 Female Syce1l -/- 199 Finished Pipeline DCC 9.1
J20281 2016-02-12 Female Syce1l -/- 199 Finished Pipeline DCC 20.6
J20347 2016-02-12 Male Syce1l -/- 199 Finished Pipeline DCC 16.1
J20338 2016-02-12 Female Syce1l -/+ 199 Finished Pipeline DCC 22.3
J20356 2016-02-12 Female Syce1l -/- 199 Finished Pipeline DCC 33.0
J20349 2016-02-12 Male Syce1l -/- 199 Finished Pipeline DCC 13.3
J20339 2016-02-12 Female Syce1l -/- 199 Finished Pipeline DCC 25.2
J20340 2016-02-12 Female Syce1l -/- 199 Finished Pipeline DCC 8.3
J20353 2016-02-12 Male Syce1l -/- 199 Finished Pipeline DCC 4.2
J20342 2016-02-12 Female Syce1l -/- 199 Finished Pipeline DCC 13.3
J20351 2016-02-12 Male Syce1l -/- 199 Finished Pipeline DCC 21.3
J20348 2016-02-12 Male Syce1l -/- 199 Finished Pipeline DCC 28.5
J19262 2016-02-12 Female Ifnk -/- 199 Finished Pipeline DCC 5.9
J19266 2016-02-12 Female Ifnk -/- 199 Finished Pipeline DCC 31.2
J19269 2016-02-12 Male Ifnk -/- 199 Finished Pipeline DCC 26.7
J19271 2016-02-12 Male Ifnk -/- 199 Finished Pipeline DCC 2.2
J20677 2016-02-12 Female Foxred2 -/- 199 Finished Pipeline DCC 13.3
J20682 2016-02-12 Male Foxred2 -/- 199 Finished Pipeline DCC 12.3
J20448 2016-02-12 Male Myo1h/2J -/+ 199 Found Dead DCC 10.1
J20451 2016-02-12 Male Myo1h/2J -/+ 199 Finished Pipeline DCC 8.3
J20447 2016-02-12 Female Myo1h/2J -/+ 199 Finished Pipeline DCC 6.9
J20449 2016-02-12 Female Myo1h/2J -/+ 199 Finished Pipeline DCC 8.2
J20450 2016-02-12 Female Myo1h/2J -/+ 199 Finished Pipeline DCC 21.8
J20452 2016-02-12 Female Myo1h/2J -/+ 199 Finished Pipeline DCC 7.9
J20468 2016-02-12 Male Mos -/- 199 Finished Pipeline DCC 17.6
J20472 2016-02-12 Female Mos -/- 199 Finished Pipeline DCC -4.2
J20473 2016-02-12 Female Mos -/- 199 Finished Pipeline DCC 22.5
J19911 2016-02-12 Male Fndc4 -/- 199 Finished Pipeline DCC 2.4
J19918 2016-02-12 Male Fndc4 -/- 199 Finished Pipeline DCC 26.2
J20417 2016-02-12 Male Nt5c -/- 199 Finished Pipeline DCC 19.3
J20418 2016-02-12 Male Nt5c -/- 199 Finished Pipeline DCC 39.0
J20420 2016-02-12 Male Nt5c -/- 199 Finished Pipeline DCC 7.5
J20889 2016-02-12 Female Tmem181a -/- 199 Finished Pipeline DCC 36.1
J20894 2016-02-12 Male Tmem181a -/- 199 Finished Pipeline DCC 32.4
J20890 2016-02-12 Female Tmem181a -/- 199 Finished Pipeline DCC 27.8
J20896 2016-02-12 Male Tmem181a -/- 199 Finished Pipeline DCC 21.1
J20425 2016-02-12 Male Syce1/2J -/- 199 Finished Pipeline DCC 1.1
J20434 2016-02-12 Male Syce1/2J -/- 199 Finished Pipeline DCC 23.0
J20536 2016-02-12 Male Tex101 -/- 199 Finished Pipeline DCC 28.7
J20537 2016-02-12 Male Tex101 -/- 199 Finished Pipeline DCC 28.0
J20549 2016-02-12 Male Tex101 -/- 199 Finished Pipeline DCC 11.2
J20555 2016-02-12 Female Sprr1b/2J -/- 199 Finished Pipeline DCC 24.3
J20205 2016-02-12 Female Esrra -/- 199 Finished Pipeline DCC 22.4
J20206 2016-02-12 Female Esrra -/- 199 Finished Pipeline DCC 5.3
J19339 2016-02-12 Female Ap4e1 -/+ 199 Finished Pipeline DCC 8.9
J19346 2016-02-12 Female Ap4e1 -/+ 199 Finished Pipeline DCC 26.1
J19348 2016-02-12 Male Ap4e1 -/+ 199 Finished Pipeline DCC 27.1
J18467 2016-02-12 Male Tssk5 -/- 199 Finished Pipeline DCC 0.4
J18469 2016-02-12 Male Tssk5 -/- 199 Finished Pipeline DCC -13.2
J18465 2016-02-12 Male Tssk5 -/- 199 Finished Pipeline DCC 20.4
J18470 2016-02-12 Male Tssk5 -/- 199 Finished Pipeline DCC 10.5
J20045 2016-02-12 Female Gpr19 -/- 199 Finished Pipeline DCC 12.5
J20491 2016-02-12 Female Pold2 -/+ 199 Finished Pipeline DCC 1.1
J20493 2016-02-12 Female Pold2 -/+ 199 Finished Pipeline DCC 11.3
J20494 2016-02-12 Female Pold2 -/+ 199 Finished Pipeline DCC 31.7
J20495 2016-02-12 Female Pold2 -/+ 199 Finished Pipeline DCC 21.4
J20496 2016-02-12 Male Pold2 -/+ 199 Finished Pipeline DCC 27.4
J20500 2016-02-12 Male Pold2 -/+ 199 Finished Pipeline DCC 6.5
J20502 2016-02-12 Male Pold2 -/+ 199 Finished Pipeline DCC 26.1
J19285 2016-02-12 Female Rab3gap2 -/- 199 Finished Pipeline DCC 25.9
J19286 2016-02-12 Female Rab3gap2 -/- 199 Finished Pipeline DCC -1.0
J19291 2016-02-12 Male Rab3gap2 -/- 199 Finished Pipeline DCC 4.8
J19293 2016-02-12 Male Rab3gap2 -/- 199 None DCC 17.8
J19302 2016-02-12 Female Rab3gap2 -/- 199 Finished Pipeline DCC 11.3
J19304 2016-02-12 Female Rab3gap2 -/- 199 Finished Pipeline DCC 20.9
J20370 2016-02-12 Female Rnf133 -/- 199 Finished Pipeline DCC 24.0
J22921 2016-02-12 Female C57BL/6NJ 199 Finished Pipeline DCC 6.7
J22927 2016-02-12 Male C57BL/6NJ 199 Finished Pipeline DCC 5.1
J19705 2016-02-05 Female Serpina7 -/- 199 Finished Pipeline DCC 25.3
J19709 2016-02-05 Male Serpina7 -/Y 199 Other DCC 6.2
J19706 2016-02-05 Female Serpina7 -/- 199 Finished Pipeline DCC 27.7
J19710 2016-02-05 Male Serpina7 -/Y 199 Finished Pipeline DCC 13.9
J19707 2016-02-05 Female Serpina7 -/- 199 Finished Pipeline DCC 32.6
J19711 2016-02-05 Male Serpina7 -/Y 199 Finished Pipeline DCC 34.2
J19708 2016-02-05 Female Serpina7 -/- 199 Finished Pipeline DCC 18.7
J19712 2016-02-05 Male Serpina7 -/Y 199 Found Dead DCC 16.6
J21203 2016-02-05 Female C57BL/6NJ 199 Finished Pipeline DCC 23.2
J21204 2016-02-05 Female C57BL/6NJ 199 Finished Pipeline DCC 17.0
J21208 2016-02-05 Male C57BL/6NJ 199 Other DCC 4.2
J21205 2016-02-05 Female C57BL/6NJ 199 Finished Pipeline DCC -0.1
J21210 2016-02-05 Male C57BL/6NJ 199 Finished Pipeline DCC 9.4
J21206 2016-02-05 Female C57BL/6NJ 199 Finished Pipeline DCC 18.5
J21211 2016-02-05 Male C57BL/6NJ 199 Other DCC 19.0
J21207 2016-02-05 Female C57BL/6NJ 199 Finished Pipeline DCC 22.5
J21212 2016-02-05 Male C57BL/6NJ 199 Other DCC 14.7
J19774 2016-02-05 Female Enox1 -/+ 199 Finished Pipeline DCC 18.4
J19777 2016-02-05 Male Enox1 -/+ 199 Finished Pipeline DCC 19.3
J19873 2016-02-05 Female Ilk -/+ 199 Finished Pipeline DCC 19.7
J19874 2016-02-05 Female Ilk -/+ 199 Finished Pipeline DCC 12.0
J19882 2016-02-05 Female Arpc5l -/- 199 Finished Pipeline DCC 12.4
J19887 2016-02-05 Male Arpc5l -/- 199 Finished Pipeline DCC 10.7
J19890 2016-02-05 Male Arpc5l -/- 199 Finished Pipeline DCC -0.8
J18378 2016-02-05 Female Hoxc12 -/- 199 Other DCC 18.7
J18382 2016-02-05 Male Hoxc12 -/- 199 Found Dead DCC 17.2
J18398 2016-02-05 Male Hoxc12 -/- 199 Found Dead DCC 9.6
J18402 2016-02-05 Male Hoxc12 -/- 199 Found Dead DCC 10.0
J18404 2016-02-05 Female Hoxc12 -/- 199 Other DCC 19.2
J18347 2016-02-05 Female Pip5k1c -/+ 199 Finished Pipeline DCC 19.0
J18352 2016-02-05 Male Pip5k1c -/+ 199 Finished Pipeline DCC 26.9
J18353 2016-02-05 Male Pip5k1c -/+ 199 Finished Pipeline DCC 11.0
J18357 2016-02-05 Female Pip5k1c -/+ 199 Finished Pipeline DCC 19.0
J18349 2016-02-05 Female Pip5k1c -/+ 199 Finished Pipeline DCC 12.8
J18350 2016-02-05 Female Pip5k1c -/+ 199 Finished Pipeline DCC 16.9
J18354 2016-02-05 Male Pip5k1c -/+ 199 Finished Pipeline DCC -3.8
J18360 2016-02-05 Female Pip5k1c -/+ 199 Finished Pipeline DCC 13.6
J18361 2016-02-05 Female Pip5k1c -/+ 199 Finished Pipeline DCC 21.6
J18362 2016-02-05 Female Pip5k1c -/+ 199 Finished Pipeline DCC 17.5
J18363 2016-02-05 Female Pip5k1c -/+ 199 Finished Pipeline DCC 17.1
J18480 2016-02-05 Female Paqr7 -/- 199 Finished Pipeline DCC 26.4
J18483 2016-02-05 Male Paqr7 -/- 199 Finished Pipeline DCC 6.5
J21176 2016-02-05 Female C57BL/6NJ 199 Finished Pipeline DCC 20.1
J21180 2016-02-05 Male C57BL/6NJ 199 Finished Pipeline DCC 17.9
J21181 2016-02-05 Male C57BL/6NJ 199 Finished Pipeline DCC 26.9
J21175 2016-02-05 Female C57BL/6NJ 199 Finished Pipeline DCC 7.2
J21177 2016-02-05 Female C57BL/6NJ 199 Finished Pipeline DCC 31.5
J21182 2016-02-05 Male C57BL/6NJ 199 Finished Pipeline DCC 29.3
J21178 2016-02-05 Female C57BL/6NJ 199 Finished Pipeline DCC 21.7
J21183 2016-02-05 Male C57BL/6NJ 199 Finished Pipeline DCC 33.0
J21179 2016-02-05 Female C57BL/6NJ 199 Finished Pipeline DCC 3.9
J21184 2016-02-05 Male C57BL/6NJ 199 Finished Pipeline DCC 19.9
J20231 2016-02-05 Male Hemgn -/- 199 Finished Pipeline DCC -3.9
J20232 2016-02-05 Male Hemgn -/- 199 Finished Pipeline DCC 8.6
J17236 2016-02-05 Female Sprr1b/2J -/- 199 Finished Pipeline DCC 24.7
J17246 2016-02-05 Male Sprr1b/2J -/- 199 Finished Pipeline DCC 5.6
J17239 2016-02-05 Male Sprr1b/2J -/- 199 Finished Pipeline DCC 13.1
J17254 2016-02-05 Female Sprr1b/2J -/- 199 Finished Pipeline DCC 19.4
J17256 2016-02-05 Male Sprr1b/2J -/- 199 Finished Pipeline DCC 7.1
J17238 2016-02-05 Male Sprr1b/2J -/- 199 Finished Pipeline DCC 29.6
J20486 2016-02-05 Female Spp1 -/- 199 Finished Pipeline DCC 4.2
J20487 2016-02-05 Female Spp1 -/- 199 Finished Pipeline DCC 7.0
J20488 2016-02-05 Female Spp1 -/- 199 Finished Pipeline DCC 6.9
J20489 2016-02-05 Male Spp1 -/- 199 Finished Pipeline DCC 24.6
J18339 2016-02-05 Female Car12/2J -/- 199 Finished Pipeline DCC 12.4
J18341 2016-02-05 Male Car12/2J -/- 199 Finished Pipeline DCC 6.1
J17154 2016-02-05 Female Kif3c -/+ 199 Finished Pipeline DCC 15.1
J17165 2016-02-05 Male Kif3c -/+ 199 Finished Pipeline DCC 16.3
J17155 2016-02-05 Female Kif3c -/+ 199 Finished Pipeline DCC 10.6
J17157 2016-02-05 Female Kif3c -/+ 199 Finished Pipeline DCC 1.9
J17161 2016-02-05 Female Kif3c -/+ 199 Finished Pipeline DCC 4.2
J17166 2016-02-05 Male Kif3c -/+ 199 Finished Pipeline DCC 10.4
J17563 2016-02-05 Female Kntc1 -/+ 199 Finished Pipeline DCC 17.3
J17582 2016-02-05 Female Kntc1 -/+ 199 Finished Pipeline DCC 22.7
J17562 2016-02-05 Female Kntc1 -/+ 199 Finished Pipeline DCC 17.4
J17583 2016-02-05 Female Kntc1 -/+ 199 Finished Pipeline DCC 25.5
J18412 2016-02-05 Female Eif1b -/- 199 Finished Pipeline DCC 20.4
J18415 2016-02-05 Male Eif1b -/- 199 Finished Pipeline DCC 22.7
J17419 2016-02-05 Male Oard1 -/- 199 Finished Pipeline DCC -19.7
J18455 2016-02-05 Male Oard1 -/- 199 Finished Pipeline DCC 15.4
J18452 2016-02-05 Female Oard1 -/- 199 Finished Pipeline DCC 23.3
J19815 2016-02-05 Female Tssk5 -/- 199 Finished Pipeline DCC 26.3
J19819 2016-02-05 Male Tssk5 -/- 199 Finished Pipeline DCC 32.9
J19820 2016-02-05 Male Tssk5 -/- 199 Finished Pipeline DCC 27.4
J19216 2016-02-05 Female Rbm4b -/- 199 Finished Pipeline DCC -6.3
J19244 2016-02-05 Female Rbm4b -/- 199 Finished Pipeline DCC 52.4
J19250 2016-02-05 Male Rbm4b -/- 199 Finished Pipeline DCC 0.9
J19255 2016-02-05 Female Rbm4b -/- 199 Finished Pipeline DCC 41.0
J20098 2016-02-05 Female Ptpru -/- 199 Finished Pipeline DCC 7.9
J20182 2016-02-05 Female Ptpn5 -/- 199 Finished Pipeline DCC -2.7
J20184 2016-02-05 Male Ptpn5 -/- 199 Finished Pipeline DCC 20.8
J20185 2016-02-05 Male Ptpn5 -/- 199 Finished Pipeline DCC 2.0
J20186 2016-02-05 Male Ptpn5 -/- 199 Finished Pipeline DCC 0.2
J17040 2016-02-05 Female Aurka -/+ 199 Finished Pipeline DCC 29.2
J17045 2016-02-05 Male Aurka -/+ 199 Finished Pipeline DCC 11.6
J17047 2016-02-05 Male Aurka -/+ 199 Finished Pipeline DCC 11.3
J20541 2016-02-05 Male Rps6kl1 -/- 199 Finished Pipeline DCC 16.0
J20542 2016-02-05 Male Rps6kl1 -/- 199 Finished Pipeline DCC 11.6
J19640 2016-01-29 Female Zfp219 -/- 199 Finished Pipeline DCC 29.4
J19641 2016-01-29 Female Zfp219 -/- 199 Finished Pipeline DCC 28.9
J19642 2016-01-29 Female Zfp219 -/- 199 Finished Pipeline DCC 22.8
J19645 2016-01-29 Male Zfp219 -/- 199 Finished Pipeline DCC 16.5
J19646 2016-01-29 Male Zfp219 -/- 199 Finished Pipeline DCC 24.9
J19643 2016-01-29 Female Zfp219 -/- 199 Finished Pipeline DCC 6.4
J19644 2016-01-29 Female Zfp219 -/- 199 Finished Pipeline DCC 16.3
J15705 2016-01-29 Male Rad21l -/- 199 Finished Pipeline DCC 10.4
J15706 2016-01-29 Male Rad21l -/- 199 Finished Pipeline DCC 12.8
J19587 2016-01-29 Male Mpdz -/- 199 Finished Pipeline DCC 18.0
J16806 2016-01-29 Female Ube2m/2J -/+ 199 Finished Pipeline DCC 35.8
J16815 2016-01-29 Male Ube2m/2J -/+ 199 Finished Pipeline DCC 8.0
J19677 2016-01-29 Female C57BL/6NJ 199 Finished Pipeline DCC 19.5
J19678 2016-01-29 Female C57BL/6NJ 199 Finished Pipeline DCC 30.6
J19682 2016-01-29 Male C57BL/6NJ 199 Found Dead DCC 2.5
J19683 2016-01-29 Male C57BL/6NJ 199 Finished Pipeline DCC 7.6
J19679 2016-01-29 Female C57BL/6NJ 199 Finished Pipeline DCC 10.9
J19684 2016-01-29 Male C57BL/6NJ 199 Finished Pipeline DCC 9.2
J19680 2016-01-29 Female C57BL/6NJ 199 Finished Pipeline DCC 13.1
J19685 2016-01-29 Male C57BL/6NJ 199 Finished Pipeline DCC 13.5
J19681 2016-01-29 Female C57BL/6NJ 199 Finished Pipeline DCC 30.9
J19686 2016-01-29 Male C57BL/6NJ 199 Finished Pipeline DCC 25.7
J17268 2016-01-29 Female Phkg2 -/+ 199 Finished Pipeline DCC -3.3
J17269 2016-01-29 Female Phkg2 -/+ 199 Finished Pipeline DCC 19.5
J19544 2016-01-29 Female Rexo4 -/- 199 Finished Pipeline DCC 8.9
J19545 2016-01-29 Female Rexo4 -/- 199 Finished Pipeline DCC 15.8
J19546 2016-01-29 Female Rexo4 -/- 199 Finished Pipeline DCC 5.6
J19547 2016-01-29 Female Rexo4 -/- 199 Finished Pipeline DCC 20.3
J17302 2016-01-29 Female 1700016K19Rik -/- 199 Finished Pipeline DCC 27.0
J17307 2016-01-29 Male 1700016K19Rik -/- 199 Finished Pipeline DCC 22.5
J17318 2016-01-29 Female 1700016K19Rik -/- 199 Finished Pipeline DCC 21.6
J17321 2016-01-29 Female 1700016K19Rik -/- 199 Finished Pipeline DCC 14.8
J17328 2016-01-29 Female 1700016K19Rik -/- 199 Finished Pipeline DCC 10.4
J17324 2016-01-29 Male 1700016K19Rik -/- 199 Finished Pipeline DCC 33.1
J17343 2016-01-29 Male Snx3 -/+ 199 Finished Pipeline DCC 4.3
J18641 2016-01-29 Female Rps6kl1 -/- 199 Finished Pipeline DCC 21.5
J18642 2016-01-29 Female Rps6kl1 -/- 199 Finished Pipeline DCC 1.0
J18643 2016-01-29 Male Rps6kl1 -/- 199 Finished Pipeline DCC 9.4
J18644 2016-01-29 Male Rps6kl1 -/- 199 Finished Pipeline DCC 20.6
J18645 2016-01-29 Male Rps6kl1 -/- 199 Finished Pipeline DCC 24.7
J16517 2016-01-29 Female Stx18 -/+ 199 Finished Pipeline DCC 21.9
J17420 2016-01-29 Female Ap4e1 -/+ 199 Finished Pipeline DCC -4.0
J17429 2016-01-29 Male Ap4e1 -/+ 199 Finished Pipeline DCC -9.5
J17421 2016-01-29 Female Ap4e1 -/+ 199 Finished Pipeline DCC 1.6
J17430 2016-01-29 Male Ap4e1 -/+ 199 Finished Pipeline DCC -0.1
J17427 2016-01-29 Female Ap4e1 -/+ 199 Finished Pipeline DCC 29.4
J17367 2016-01-29 Female Rab11fip5 -/- 199 Finished Pipeline DCC -5.5
J17369 2016-01-29 Male Rab11fip5 -/- 199 Finished Pipeline DCC 31.8
J17370 2016-01-29 Male Rab11fip5 -/- 199 Finished Pipeline DCC 15.1
J18853 2016-01-29 Female Bhlhe40 -/- 199 Finished Pipeline DCC 30.6
J16869 2016-01-29 Male Lcn2 -/- 199 Finished Pipeline DCC -1.2
J16870 2016-01-29 Male Lcn2 -/- 199 Finished Pipeline DCC 8.7
J16871 2016-01-29 Male Lcn2 -/- 199 Finished Pipeline DCC 13.0
J16872 2016-01-29 Male Lcn2 -/- 199 Finished Pipeline DCC 16.3
J16873 2016-01-29 Male Lcn2 -/- 199 Finished Pipeline DCC 27.5
J16725 2016-01-29 Female Satb1 -/+ 199 Finished Pipeline DCC 34.1
J16726 2016-01-29 Female Satb1 -/+ 199 Finished Pipeline DCC 13.2
J16728 2016-01-29 Female Satb1 -/+ 199 Finished Pipeline DCC 1.7
J16727 2016-01-29 Female Satb1 -/+ 199 Finished Pipeline DCC 20.0
J16764 2016-01-29 Female Chn1 -/+ 199 Finished Pipeline DCC 35.2
J16766 2016-01-29 Female Chn1 -/+ 199 Finished Pipeline DCC 20.5
J16829 2016-01-29 Male Chn1 -/+ 199 Finished Pipeline DCC 7.0
J16831 2016-01-29 Male Chn1 -/+ 199 Finished Pipeline DCC 23.3
J16767 2016-01-29 Female Chn1 -/+ 199 Finished Pipeline DCC 18.5
J16786 2016-01-29 Male Chn1 -/+ 199 Finished Pipeline DCC 14.2
J16826 2016-01-29 Female Chn1 -/+ 199 Finished Pipeline DCC 27.6
J16833 2016-01-29 Male Chn1 -/+ 199 Finished Pipeline DCC 31.0
J16768 2016-01-29 Male Chn1 -/+ 199 Finished Pipeline DCC 10.7
J16770 2016-01-29 Male Chn1 -/+ 199 Finished Pipeline DCC 31.7
J16783 2016-01-29 Female Chn1 -/+ 199 Finished Pipeline DCC 7.2
J16827 2016-01-29 Female Chn1 -/+ 199 Finished Pipeline DCC 6.1
J16789 2016-01-29 Male Chn1 -/+ 199 Finished Pipeline DCC 22.4
J16790 2016-01-29 Male Chn1 -/+ 199 Found Dead DCC 29.6
J16799 2016-01-29 Female Chn1 -/+ 199 Finished Pipeline DCC 13.7
J14956 2016-01-29 Female Tex101 -/- 199 Finished Pipeline DCC 7.0
J14958 2016-01-29 Male Tex101 -/- 199 Finished Pipeline DCC 9.9
J16583 2016-01-29 Female Wdr36/2J -/+ 199 Finished Pipeline DCC 1.7
J16592 2016-01-29 Male Wdr36/2J -/+ 199 Finished Pipeline DCC 7.5
J16584 2016-01-29 Female Wdr36/2J -/+ 199 Finished Pipeline DCC 14.6
J16585 2016-01-29 Female Wdr36/2J -/+ 199 Sick DCC 0.7
J16588 2016-01-29 Male Wdr36/2J -/+ 199 Finished Pipeline DCC 28.0
J16586 2016-01-29 Female Wdr36/2J -/+ 199 Finished Pipeline DCC 2.4
J16587 2016-01-29 Female Wdr36/2J -/+ 199 Finished Pipeline DCC 2.7
J16591 2016-01-29 Male Wdr36/2J -/+ 199 Finished Pipeline DCC -7.8
J19805 2016-01-29 Female C57BL/6NJ 199 Finished Pipeline DCC 6.1
J19806 2016-01-29 Female C57BL/6NJ 199 Finished Pipeline DCC 15.3
J19810 2016-01-29 Male C57BL/6NJ 199 Finished Pipeline DCC 17.6
J19811 2016-01-29 Male C57BL/6NJ 199 Finished Pipeline DCC 11.1
J19807 2016-01-29 Female C57BL/6NJ 199 Finished Pipeline DCC 18.7
J19812 2016-01-29 Male C57BL/6NJ 199 Finished Pipeline DCC -2.0
J19808 2016-01-29 Female C57BL/6NJ 199 Finished Pipeline DCC 16.3
J19813 2016-01-29 Male C57BL/6NJ 199 Finished Pipeline DCC 24.5
J19809 2016-01-29 Female C57BL/6NJ 199 Finished Pipeline DCC 4.6
J19814 2016-01-29 Male C57BL/6NJ 199 Finished Pipeline DCC 28.4
J16736 2016-01-29 Male Gpr183 -/- 199 Finished Pipeline DCC 13.3
J16990 2016-01-29 Female Grcc10 -/+ 199 Finished Pipeline DCC 29.2
J16996 2016-01-29 Male Grcc10 -/+ 199 Finished Pipeline DCC 19.9
J16991 2016-01-29 Female Grcc10 -/+ 199 Finished Pipeline DCC 15.1
J16997 2016-01-29 Male Grcc10 -/+ 199 Finished Pipeline DCC 8.5
J16993 2016-01-29 Female Grcc10 -/+ 199 Finished Pipeline DCC 16.8
J16999 2016-01-29 Male Grcc10 -/+ 199 Finished Pipeline DCC 36.0
J16994 2016-01-29 Female Grcc10 -/+ 199 Finished Pipeline DCC 7.8
J17263 2016-01-29 Male Sapcd1 -/+ 199 Finished Pipeline DCC 24.0
J18523 2016-01-29 Male Gpr156 -/- 199 Finished Pipeline DCC 27.8
J18309 2016-01-22 Female C57BL/6NJ 199 Finished Pipeline DCC -7.2
J18310 2016-01-22 Female C57BL/6NJ 199 Finished Pipeline DCC 4.9
J18314 2016-01-22 Male C57BL/6NJ 199 Finished Pipeline DCC 20.4
J18315 2016-01-22 Male C57BL/6NJ 199 Finished Pipeline DCC 17.0
J18311 2016-01-22 Female C57BL/6NJ 199 Finished Pipeline DCC 23.0
J18316 2016-01-22 Male C57BL/6NJ 199 Finished Pipeline DCC 31.8
J18312 2016-01-22 Female C57BL/6NJ 199 Finished Pipeline DCC 46.1
J18317 2016-01-22 Male C57BL/6NJ 199 Finished Pipeline DCC 28.6
J18313 2016-01-22 Female C57BL/6NJ 199 Finished Pipeline DCC 12.4
J18318 2016-01-22 Male C57BL/6NJ 199 Finished Pipeline DCC 17.7
J18295 2016-01-22 Female C57BL/6NJ 199 Found Dead DCC 9.2
J18296 2016-01-22 Female C57BL/6NJ 199 Finished Pipeline DCC 24.2
J18300 2016-01-22 Male C57BL/6NJ 199 Finished Pipeline DCC 12.8
J18301 2016-01-22 Male C57BL/6NJ 199 Finished Pipeline DCC 8.1
J18298 2016-01-22 Female C57BL/6NJ 199 Finished Pipeline DCC 12.0
J18303 2016-01-22 Male C57BL/6NJ 199 Finished Pipeline DCC 26.1
J18297 2016-01-22 Female C57BL/6NJ 199 Finished Pipeline DCC 23.5
J18302 2016-01-22 Male C57BL/6NJ 199 Finished Pipeline DCC 8.0
J18299 2016-01-22 Female C57BL/6NJ 199 Finished Pipeline DCC -11.5
J18304 2016-01-22 Male C57BL/6NJ 199 Finished Pipeline DCC 13.2
J18194 2016-01-22 Female Ipp -/- 199 Finished Pipeline DCC -2.2
J18195 2016-01-22 Female Ipp -/- 199 Finished Pipeline DCC -2.5
J18198 2016-01-22 Male Ipp -/- 199 Finished Pipeline DCC 12.4
J18199 2016-01-22 Male Ipp -/- 199 Finished Pipeline DCC 17.9
J18200 2016-01-22 Male Ipp -/- 199 Finished Pipeline DCC 15.2
J18185 2016-01-22 Female Tmem151b -/- 199 Finished Pipeline DCC -4.7
J18186 2016-01-22 Male Tmem151b -/- 199 Finished Pipeline DCC 27.5
J13977 2016-01-22 Male Mpdz -/- 199 Finished Pipeline DCC 22.6
J15168 2016-01-22 Female Car12/2J -/- 199 Finished Pipeline DCC 16.9
J15171 2016-01-22 Female Car12/2J -/- 199 Finished Pipeline DCC 27.6
J16837 2016-01-22 Female Adgrb2 -/- 199 Finished Pipeline DCC 2.0
J16838 2016-01-22 Female Adgrb2 -/- 199 Finished Pipeline DCC 5.3
J15002 2016-01-22 Female Kif3c -/+ 199 Finished Pipeline DCC 11.1
J15003 2016-01-22 Female Kif3c -/+ 199 Finished Pipeline DCC -12.0
J15005 2016-01-22 Female Kif3c -/+ 199 Finished Pipeline DCC 23.9
J15007 2016-01-22 Male Kif3c -/+ 199 Finished Pipeline DCC 17.9
J15008 2016-01-22 Male Kif3c -/+ 199 Finished Pipeline DCC 8.0
J15014 2016-01-22 Female Kif3c -/+ 199 Finished Pipeline DCC 2.4
J15016 2016-01-22 Male Kif3c -/+ 199 Finished Pipeline DCC 22.6
J15542 2016-01-22 Female Sapcd1 -/+ 199 Finished Pipeline DCC 24.0
J15553 2016-01-22 Male Sapcd1 -/+ 199 Finished Pipeline DCC 18.5
J15567 2016-01-22 Male Sapcd1 -/+ 199 Finished Pipeline DCC 27.3
J15568 2016-01-22 Male Sapcd1 -/+ 199 Finished Pipeline DCC 11.7
J15543 2016-01-22 Female Sapcd1 -/+ 199 Finished Pipeline DCC 8.6
J15561 2016-01-22 Male Sapcd1 -/+ 199 Finished Pipeline DCC -3.1
J15562 2016-01-22 Male Sapcd1 -/+ 199 Finished Pipeline DCC 0.5
J15544 2016-01-22 Female Sapcd1 -/+ 199 Finished Pipeline DCC 16.1
J15570 2016-01-22 Male Sapcd1 -/+ 199 Finished Pipeline DCC 12.9
J15056 2016-01-22 Female Prss40 -/- 199 Finished Pipeline DCC 22.7
J15057 2016-01-22 Female Prss40 -/- 199 Finished Pipeline DCC 12.5
J15062 2016-01-22 Female Prss40 -/- 199 Finished Pipeline DCC 36.4
J15063 2016-01-22 Female Prss40 -/- 199 Finished Pipeline DCC 23.9
J16791 2016-01-22 Female Ypel1 -/- 199 Finished Pipeline DCC 11.6
J16792 2016-01-22 Female Ypel1 -/- 199 Finished Pipeline DCC -5.8
J16794 2016-01-22 Male Ypel1 -/- 199 Finished Pipeline DCC 33.2
J16793 2016-01-22 Female Ypel1 -/- 199 Finished Pipeline DCC 22.4
J16795 2016-01-22 Male Ypel1 -/- 199 Finished Pipeline DCC 26.8
J16796 2016-01-22 Female Ypel1 -/- 199 Finished Pipeline DCC 15.8
J14943 2016-01-22 Male Lin28b -/- 199 Finished Pipeline DCC 23.8
J14944 2016-01-22 Male Lin28b -/- 199 Finished Pipeline DCC 7.4
J15539 2016-01-22 Female Efna4 -/- 199 Finished Pipeline DCC 9.1
J13526 2016-01-22 Female Ehmt2/2J -/+ 199 Finished Pipeline DCC 31.5
J13532 2016-01-22 Male Ehmt2/2J -/+ 199 Finished Pipeline DCC -1.5
J13527 2016-01-22 Female Ehmt2/2J -/+ 199 Finished Pipeline DCC 3.8
J13533 2016-01-22 Male Ehmt2/2J -/+ 199 Finished Pipeline DCC 19.5
J13530 2016-01-22 Female Ehmt2/2J -/+ 199 Finished Pipeline DCC -5.0
J13535 2016-01-22 Male Ehmt2/2J -/+ 199 Finished Pipeline DCC 14.1
J15081 2016-01-22 Male Sfxn4 -/- 199 Finished Pipeline DCC 23.3
J16982 2016-01-22 Female Try4 -/- 199 Finished Pipeline DCC 11.7
J16986 2016-01-22 Male Try4 -/- 199 Finished Pipeline DCC 2.6
J16983 2016-01-22 Female Try4 -/- 199 Finished Pipeline DCC 28.9
J16987 2016-01-22 Male Try4 -/- 199 Finished Pipeline DCC 15.1
J16984 2016-01-22 Female Try4 -/- 199 Finished Pipeline DCC 29.7
J16985 2016-01-22 Female Try4 -/- 199 Finished Pipeline DCC -13.2
J13390 2016-01-22 Male Sprr1b/2J -/- 199 Finished Pipeline DCC 1.7
J13392 2016-01-22 Male Sprr1b/2J -/- 199 Finished Pipeline DCC 18.4
J16875 2016-01-22 Female Nt5c -/- 199 Finished Pipeline DCC 27.3
J16877 2016-01-22 Male Nt5c -/- 199 Finished Pipeline DCC 19.3
J16876 2016-01-22 Female Nt5c -/- 199 Finished Pipeline DCC 0.9
J16878 2016-01-22 Male Nt5c -/- 199 Finished Pipeline DCC 1.8
J16879 2016-01-22 Male Nt5c -/- 199 Finished Pipeline DCC -3.4
J16882 2016-01-22 Female Nt5c -/- 199 Finished Pipeline DCC 9.0
J16884 2016-01-22 Female Nt5c -/- 199 Finished Pipeline DCC 23.1
J16880 2016-01-22 Male Nt5c -/- 199 Finished Pipeline DCC 14.6
J16881 2016-01-22 Male Nt5c -/- 199 Finished Pipeline DCC 18.3
J16883 2016-01-22 Female Nt5c -/- 199 Finished Pipeline DCC -4.7
J14947 2016-01-22 Female Tex101 -/- 199 Finished Pipeline DCC -10.3
J14949 2016-01-22 Female Tex101 -/- 199 Finished Pipeline DCC 8.4
J14950 2016-01-22 Male Tex101 -/- 199 Finished Pipeline DCC 31.7
J16927 2016-01-22 Female Nrsn1 -/- 199 Finished Pipeline DCC 32.5
J16928 2016-01-22 Female Nrsn1 -/- 199 Finished Pipeline DCC 24.9
J16929 2016-01-22 Female Nrsn1 -/- 199 Finished Pipeline DCC 10.6
J16930 2016-01-22 Female Nrsn1 -/- 199 Finished Pipeline DCC 26.9
J15116 2016-01-22 Male Fitm2 -/+ 199 Finished Pipeline DCC 5.8
J15117 2016-01-22 Male Fitm2 -/+ 199 Finished Pipeline DCC 9.2
J15134 2016-01-22 Female Fitm2 -/+ 199 Finished Pipeline DCC 36.5
J15122 2016-01-22 Female Fitm2 -/+ 199 Finished Pipeline DCC 13.5
J16816 2016-01-16 Female C57BL/6NJ 199 Finished Pipeline DCC 25.7
J16817 2016-01-16 Female C57BL/6NJ 199 Finished Pipeline DCC 17.5
J16821 2016-01-16 Male C57BL/6NJ 199 Finished Pipeline DCC 17.4
J16822 2016-01-16 Male C57BL/6NJ 199 Finished Pipeline DCC 18.7
J16818 2016-01-16 Female C57BL/6NJ 199 Finished Pipeline DCC 10.6
J16823 2016-01-16 Male C57BL/6NJ 199 Finished Pipeline DCC 17.2
J16819 2016-01-16 Female C57BL/6NJ 199 Finished Pipeline DCC 2.5
J16824 2016-01-16 Male C57BL/6NJ 199 Finished Pipeline DCC 8.2
J16820 2016-01-16 Female C57BL/6NJ 199 Finished Pipeline DCC 6.4
J16825 2016-01-16 Male C57BL/6NJ 199 Finished Pipeline DCC 24.3
J14272 2016-01-16 Male Pkp4 -/- 199 Finished Pipeline DCC 4.4
J14273 2016-01-16 Male Pkp4 -/- 199 Finished Pipeline DCC 14.1
J15589 2016-01-16 Male Mdp1 -/- 199 Finished Pipeline DCC 21.8
J15590 2016-01-16 Male Mdp1 -/- 199 Finished Pipeline DCC 10.7
J14339 2016-01-16 Female Mrm3 -/+ 199 Finished Pipeline DCC 16.4
J14174 2016-01-16 Female Dolk -/+ 199 Finished Pipeline DCC 16.3
J14179 2016-01-16 Female Dolk -/+ 199 Finished Pipeline DCC 6.6
J15580 2016-01-16 Female Bmp2k -/- 199 Finished Pipeline DCC -13.4
J15582 2016-01-16 Male Bmp2k -/- 199 Finished Pipeline DCC 5.1
J15581 2016-01-16 Male Bmp2k -/- 199 Finished Pipeline DCC 18.9
J15583 2016-01-16 Male Bmp2k -/- 199 Finished Pipeline DCC 3.8
J15584 2016-01-16 Male Bmp2k -/- 199 Finished Pipeline DCC 24.2
J13981 2016-01-16 Female Ptms -/+ 199 Finished Pipeline DCC 19.4
J13982 2016-01-16 Female Ptms -/+ 199 Finished Pipeline DCC 15.2
J13983 2016-01-16 Female Ptms -/+ 199 Finished Pipeline DCC 20.8
J13984 2016-01-16 Female Ptms -/+ 199 Finished Pipeline DCC 6.5
J15576 2016-01-16 Male Prss56 -/- 199 Finished Pipeline DCC 18.4
J15577 2016-01-16 Male Prss56 -/- 199 Finished Pipeline DCC 13.5
J13852 2016-01-16 Male Dpf1 -/- 199 Finished Pipeline DCC 7.0
J13385 2016-01-16 Female Lin28b -/- 199 Finished Pipeline DCC 2.6
J13558 2016-01-16 Female Paqr7 -/- 199 Finished Pipeline DCC 25.6
J13559 2016-01-16 Female Paqr7 -/- 199 Finished Pipeline DCC 19.5
J13564 2016-01-16 Male Paqr7 -/- 199 Finished Pipeline DCC 10.1
J13408 2016-01-16 Male Prss40 -/- 199 Finished Pipeline DCC 8.6
J13409 2016-01-16 Male Prss40 -/- 199 Found Dead DCC 20.3
J13411 2016-01-16 Male Prss40 -/- 199 Finished Pipeline DCC 16.7
J13412 2016-01-16 Male Prss40 -/- 199 Finished Pipeline DCC 15.8
J13413 2016-01-16 Male Prss40 -/- 199 Finished Pipeline DCC 14.3
J13415 2016-01-16 Male Prss40 -/- 199 Finished Pipeline DCC 16.1
J13416 2016-01-16 Male Prss40 -/- 199 Finished Pipeline DCC 8.0
J13417 2016-01-16 Male Prss40 -/- 199 Finished Pipeline DCC 11.5
J13672 2016-01-16 Female Myo1h/2J -/+ 199 Finished Pipeline DCC 11.3
J13677 2016-01-16 Male Myo1h/2J -/+ 199 Finished Pipeline DCC 11.4
J13685 2016-01-16 Male Myo1h/2J -/+ 199 Finished Pipeline DCC 12.4
J13675 2016-01-16 Female Myo1h/2J -/+ 199 Finished Pipeline DCC 11.6
J13684 2016-01-16 Male Myo1h/2J -/+ 199 Finished Pipeline DCC 2.1
J13679 2016-01-16 Male Myo1h/2J -/+ 199 Finished Pipeline DCC 3.3
J13680 2016-01-16 Female Myo1h/2J -/+ 199 Finished Pipeline DCC -4.8
J13682 2016-01-16 Male Myo1h/2J -/+ 199 Finished Pipeline DCC 9.5
J13681 2016-01-16 Female Myo1h/2J -/+ 199 Finished Pipeline DCC 21.3
J13683 2016-01-16 Male Myo1h/2J -/+ 199 Finished Pipeline DCC 2.6
J15461 2016-01-16 Male Tex29 -/- 199 Finished Pipeline DCC 8.9
J15462 2016-01-16 Male Tex29 -/- 199 Finished Pipeline DCC 9.1
J13049 2016-01-16 Male Enox1 -/- 199 Finished Pipeline DCC -5.0
J13044 2016-01-16 Female Enox1 -/+ 199 Finished Pipeline DCC 13.0
J13045 2016-01-16 Female Enox1 -/+ 199 Finished Pipeline DCC 8.2
J13052 2016-01-16 Male Enox1 -/+ 199 Finished Pipeline DCC 21.8
J13055 2016-01-16 Male Enox1 -/+ 199 Finished Pipeline DCC 18.8
J13057 2016-01-16 Male Enox1 -/+ 199 Finished Pipeline DCC 10.3
J13054 2016-01-16 Male Enox1 -/+ 199 Finished Pipeline DCC 24.6
J16781 2016-01-16 Female Mettl21c -/- 199 Finished Pipeline DCC 12.5
J16782 2016-01-16 Female Mettl21c -/- 199 Finished Pipeline DCC 14.0
J16780 2016-01-16 Female Mettl21c -/- 199 Finished Pipeline DCC 15.3
J13521 2016-01-16 Female Sapcd1 -/+ 199 Finished Pipeline DCC 28.7
J13522 2016-01-16 Female Sapcd1 -/+ 199 Finished Pipeline DCC -8.0
J13520 2016-01-16 Female Sapcd1 -/+ 199 Finished Pipeline DCC 22.6
J13671 2016-01-16 Male Mos -/- 199 Finished Pipeline DCC 8.0
J13663 2016-01-16 Female Mos -/- 199 Finished Pipeline DCC 33.9
J13667 2016-01-16 Female Mos -/- 199 Finished Pipeline DCC 24.9
J16678 2016-01-16 Female Iqgap2 -/- 199 Finished Pipeline DCC 29.7
J16681 2016-01-16 Male Iqgap2 -/- 199 Finished Pipeline DCC 38.2
J16679 2016-01-16 Female Iqgap2 -/- 199 Finished Pipeline DCC 20.8
J16680 2016-01-16 Male Iqgap2 -/- 199 Finished Pipeline DCC 7.4
J13837 2016-01-16 Male Rab11a -/+ 199 Finished Pipeline DCC 3.1
J13840 2016-01-16 Male Rab11a -/+ 199 Finished Pipeline DCC 10.3
J13835 2016-01-16 Female Rab11a -/+ 199 Finished Pipeline DCC -4.2
J13836 2016-01-16 Female Rab11a -/+ 199 Finished Pipeline DCC 12.7
J16418 2016-01-16 Female C57BL/6NJ 199 Finished Pipeline DCC 18.4
J16419 2016-01-16 Female C57BL/6NJ 199 Finished Pipeline DCC 12.0
J16423 2016-01-16 Male C57BL/6NJ 199 Finished Pipeline DCC 20.0
J16424 2016-01-16 Male C57BL/6NJ 199 Finished Pipeline DCC 17.0
J16420 2016-01-16 Female C57BL/6NJ 199 Finished Pipeline DCC 19.8
J16425 2016-01-16 Male C57BL/6NJ 199 Finished Pipeline DCC 3.7
J16421 2016-01-16 Female C57BL/6NJ 199 Finished Pipeline DCC 16.2
J16426 2016-01-16 Male C57BL/6NJ 199 Finished Pipeline DCC 11.2
J16422 2016-01-16 Female C57BL/6NJ 199 Finished Pipeline DCC 27.0
J16427 2016-01-16 Male C57BL/6NJ 199 Found Dead DCC 3.5
J13400 2016-01-16 Male Sprr1b/2J -/- 199 Finished Pipeline DCC 11.6
J12412 2016-01-16 Female Lcn2 -/- 199 Finished Pipeline DCC 9.0
J12415 2016-01-16 Female Lcn2 -/- 199 Finished Pipeline DCC 28.1
J12419 2016-01-16 Male Lcn2 -/- 199 Finished Pipeline DCC 9.0
J13484 2016-01-16 Female Rps6kl1 -/- 199 Finished Pipeline DCC 18.4
J13508 2016-01-16 Female Rps6kl1 -/- 199 Finished Pipeline DCC 17.8
J13511 2016-01-16 Male Rps6kl1 -/- 199 Finished Pipeline DCC 18.3
J11949 2016-01-16 Female Ap4e1 -/+ 199 Finished Pipeline DCC 19.6
J11954 2016-01-16 Male Ap4e1 -/+ 199 Finished Pipeline DCC 18.6
J11950 2016-01-16 Female Ap4e1 -/+ 199 Finished Pipeline DCC 11.9
J11955 2016-01-16 Male Ap4e1 -/+ 199 Finished Pipeline DCC -8.9
J11952 2016-01-16 Female Ap4e1 -/+ 199 Finished Pipeline DCC 17.3
J14747 2016-01-16 Female Rap2b -/- 199 Finished Pipeline DCC 2.4
J13442 2016-01-16 Female Phkg2 -/+ 199 Finished Pipeline DCC 16.1
J13450 2016-01-16 Female Phkg2 -/+ 199 Finished Pipeline DCC 8.1
J14106 2016-01-16 Female Bclaf1 -/+ 199 Finished Pipeline DCC 3.7
J12608 2016-01-07 Female Akap11 -/- 199 Finished Pipeline DCC 19.5
J12609 2016-01-07 Female Akap11 -/- 199 Finished Pipeline DCC 25.7
J10710 2016-01-07 Female Mrm3 -/+ 199 Finished Pipeline DCC 12.4
J10711 2016-01-07 Female Mrm3 -/+ 199 Finished Pipeline DCC 16.8
J10579 2016-01-07 Female Dolk -/+ 199 Finished Pipeline DCC 13.9
J13758 2016-01-07 Female Wee2 -/- 199 Finished Pipeline DCC 22.6
J13759 2016-01-07 Female Wee2 -/- 199 Finished Pipeline DCC 9.2
J13779 2016-01-07 Male Cep295nl -/- 199 Finished Pipeline DCC 16.9
J12560 2016-01-07 Male Bclaf1 -/+ 199 Finished Pipeline DCC 15.7
J12568 2016-01-07 Male Bclaf1 -/+ 199 Finished Pipeline DCC 16.4
J12564 2016-01-07 Male Bclaf1 -/+ 199 Finished Pipeline DCC 25.6
J12569 2016-01-07 Male Bclaf1 -/+ 199 Finished Pipeline DCC 7.8
J12565 2016-01-07 Male Bclaf1 -/+ 199 Finished Pipeline DCC 21.8
J12567 2016-01-07 Male Bclaf1 -/+ 199 Finished Pipeline DCC -3.5
J13751 2016-01-07 Male Bmp2k -/- 199 Finished Pipeline DCC 22.9
J13777 2016-01-07 Female Cep295nl -/- 199 Finished Pipeline DCC 13.0
J13778 2016-01-07 Female Cep295nl -/- 199 Finished Pipeline DCC 18.2
J13769 2016-01-07 Male Pacsin2 -/- 199 Finished Pipeline DCC 7.7
J13770 2016-01-07 Male Pacsin2 -/- 199 Finished Pipeline DCC 18.5
J13743 2016-01-07 Female Prss56 -/- 199 Finished Pipeline DCC 26.8
J13744 2016-01-07 Female Prss56 -/- 199 Finished Pipeline DCC 31.7
J13750 2016-01-07 Male Prss56 -/- 199 Finished Pipeline DCC 5.4
J12559 2016-01-07 Female Bclaf1 -/+ 199 Finished Pipeline DCC 5.9
J13772 2016-01-07 Female Krt77 -/- 199 Finished Pipeline DCC 34.6
J13761 2016-01-07 Male Lipn -/- 199 Finished Pipeline DCC 22.5
J13762 2016-01-07 Male Lipn -/- 199 Found Dead DCC 8.7
J13728 2016-01-07 Female Zfp689 -/- 199 Finished Pipeline DCC 18.8
J12544 2016-01-07 Male Rab34 -/+ 199 Finished Pipeline DCC 23.9
J15380 2016-01-07 Female C57BL/6NJ 199 Finished Pipeline DCC 2.6
J15381 2016-01-07 Female C57BL/6NJ 199 Finished Pipeline DCC 6.9
J15385 2016-01-07 Male C57BL/6NJ 199 Finished Pipeline DCC 5.3
J15386 2016-01-07 Male C57BL/6NJ 199 Finished Pipeline DCC 20.6
J15382 2016-01-07 Female C57BL/6NJ 199 Finished Pipeline DCC 19.0
J15387 2016-01-07 Male C57BL/6NJ 199 Finished Pipeline DCC 14.3
J15383 2016-01-07 Female C57BL/6NJ 199 Finished Pipeline DCC 17.6
J15388 2016-01-07 Male C57BL/6NJ 199 Finished Pipeline DCC 4.7
J15384 2016-01-07 Female C57BL/6NJ 199 Finished Pipeline DCC 15.9
J15389 2016-01-07 Male C57BL/6NJ 199 Finished Pipeline DCC -0.3
J14648 2016-01-07 Female C57BL/6NJ 199 Finished Pipeline DCC 27.2
J14649 2016-01-07 Female C57BL/6NJ 199 Finished Pipeline DCC 3.0
J14653 2016-01-07 Male C57BL/6NJ 199 Finished Pipeline DCC 20.4
J14654 2016-01-07 Male C57BL/6NJ 199 Finished Pipeline DCC -9.8
J14650 2016-01-07 Female C57BL/6NJ 199 Finished Pipeline DCC 1.1
J14655 2016-01-07 Male C57BL/6NJ 199 Finished Pipeline DCC 17.0
J14651 2016-01-07 Female C57BL/6NJ 199 Finished Pipeline DCC -14.2
J14656 2016-01-07 Male C57BL/6NJ 199 Finished Pipeline DCC -10.2
J14652 2016-01-07 Female C57BL/6NJ 199 Finished Pipeline DCC 4.1
J14657 2016-01-07 Male C57BL/6NJ 199 Finished Pipeline DCC 18.6
J10494 2016-01-07 Female Odc1 -/+ 199 Finished Pipeline DCC 13.2
J13782 2016-01-07 Male Chp2 -/+ 199 Finished Pipeline DCC 22.8
J13783 2016-01-07 Male Chp2 -/+ 199 Finished Pipeline DCC 16.1
J12880 2016-01-07 Female Parg -/+ 199 Finished Pipeline DCC 2.9
J12881 2016-01-07 Female Parg -/+ 199 Finished Pipeline DCC 2.6
J12883 2016-01-07 Female Parg -/+ 199 Finished Pipeline DCC 3.7
J12884 2016-01-07 Female Parg -/+ 199 Finished Pipeline DCC 13.0
J12885 2016-01-07 Male Parg -/+ 199 Finished Pipeline DCC 26.8
J12886 2016-01-07 Male Parg -/+ 199 Finished Pipeline DCC 11.9
J12380 2016-01-07 Male Tmem79 -/- 199 Finished Pipeline DCC 16.2
J12382 2016-01-07 Male Tmem79 -/- 199 Finished Pipeline DCC 8.9
J12376 2016-01-07 Female Tmem79 -/- 199 Finished Pipeline DCC 18.8
J12377 2016-01-07 Female Tmem79 -/- 199 Finished Pipeline DCC 12.8
J12385 2016-01-07 Female Tmem79 -/- 199 Finished Pipeline DCC 11.9
J12388 2016-01-07 Female Tmem79 -/- 199 Finished Pipeline DCC 8.4
J12398 2016-01-07 Female Tmem79 -/- 199 Finished Pipeline DCC 14.5
J12400 2016-01-07 Female Tmem79 -/- 199 Finished Pipeline DCC 13.7
J12402 2016-01-07 Female Tmem79 -/- 199 Finished Pipeline DCC 23.3
J14109 2016-01-07 Female Ptpn5 -/- 199 Finished Pipeline DCC 8.6
J14110 2016-01-07 Female Ptpn5 -/- 199 Finished Pipeline DCC 5.1
J14111 2016-01-07 Female Ptpn5 -/- 199 Finished Pipeline DCC 15.9
J14114 2016-01-07 Male Ptpn5 -/- 199 Finished Pipeline DCC 6.9
J14112 2016-01-07 Female Ptpn5 -/- 199 Finished Pipeline DCC 13.4
J14113 2016-01-07 Male Ptpn5 -/- 199 Finished Pipeline DCC -1.3
J12307 2016-01-07 Male Akr1d1 -/- 199 Finished Pipeline DCC 11.1
J12308 2016-01-07 Male Akr1d1 -/- 199 Finished Pipeline DCC -1.2
J12454 2016-01-07 Female Ptpru -/- 199 Finished Pipeline DCC 14.3
J12460 2016-01-07 Female Ptpru -/- 199 Finished Pipeline DCC 0.1
J12456 2016-01-07 Male Ptpru -/- 199 Finished Pipeline DCC 12.5
J12045 2016-01-07 Female Isca1/2J -/+ 199 Finished Pipeline DCC 8.9
J12052 2016-01-07 Female Isca1/2J -/+ 199 Finished Pipeline DCC 19.1
J12050 2016-01-07 Female Isca1/2J -/+ 199 Finished Pipeline DCC 18.3
J12051 2016-01-07 Female Isca1/2J -/+ 199 Finished Pipeline DCC 20.5
J12053 2016-01-07 Male Isca1/2J -/+ 199 Finished Pipeline DCC 4.1
J12054 2016-01-07 Male Isca1/2J -/+ 199 Finished Pipeline DCC 5.9
J12055 2016-01-07 Male Isca1/2J -/+ 199 Finished Pipeline DCC 0.2
J12058 2016-01-07 Male Isca1/2J -/+ 199 Finished Pipeline DCC 16.1
J10405 2016-01-07 Female Spi1 -/+ 199 Finished Pipeline DCC 2.9
J10406 2016-01-07 Female Spi1 -/+ 199 Finished Pipeline DCC 21.4
J10407 2016-01-07 Female Spi1 -/+ 199 Finished Pipeline DCC 1.9
J12000 2016-01-07 Female Spi1 -/+ 199 Other DCC 38.8
J12342 2016-01-07 Male Gpr183 -/- 199 Finished Pipeline DCC -1.3
J12352 2016-01-07 Male Gpr183 -/- 199 Finished Pipeline DCC 6.7
J10990 2016-01-07 Female Srcin1 -/+ 199 Finished Pipeline DCC 17.4
J10993 2016-01-07 Female Srcin1 -/- 199 Finished Pipeline DCC 9.1
J13068 2016-01-07 Female Enox1 -/+ 199 Finished Pipeline DCC 28.4
J13069 2016-01-07 Female Enox1 -/+ 199 Finished Pipeline DCC 17.9
J13070 2016-01-07 Female Enox1 -/+ 199 Finished Pipeline DCC 9.1
J13072 2016-01-07 Male Enox1 -/+ 199 Finished Pipeline DCC -12.2
J13074 2016-01-07 Male Enox1 -/- 199 Finished Pipeline DCC -3.1
J13686 2016-01-07 Female Nemf -/+ 199 Finished Pipeline DCC 15.0
J13687 2016-01-07 Female Nemf -/+ 199 Finished Pipeline DCC 3.7
J13195 2016-01-07 Male Ap4e1 -/- 199 Finished Pipeline DCC 17.8
J13196 2016-01-07 Male Ap4e1 -/- 199 Found Dead DCC 22.9
J12498 2016-01-07 Female Zfp961 -/- 199 Finished Pipeline DCC 14.6
J12265 2016-01-01 Female Pacsin2 -/- 199 Finished Pipeline DCC 18.3
J12267 2016-01-01 Male Pacsin2 -/- 199 Finished Pipeline DCC 23.9
J12266 2016-01-01 Female Pacsin2 -/- 199 Finished Pipeline DCC 20.7
J12272 2016-01-01 Female Mfsd10 -/- 199 Finished Pipeline DCC 12.5
J12273 2016-01-01 Female Mfsd10 -/- 199 Finished Pipeline DCC 12.3
J12277 2016-01-01 Male Mfsd10 -/- 199 Finished Pipeline DCC 6.7
J12230 2016-01-01 Male Tbc1d4 -/- 199 Finished Pipeline DCC 0.9
J12231 2016-01-01 Male Tbc1d4 -/- 199 Finished Pipeline DCC 12.4
J12260 2016-01-01 Male Mdp1 -/- 199 Finished Pipeline DCC 26.4
J12261 2016-01-01 Male Mdp1 -/- 199 Finished Pipeline DCC 32.9
J12262 2016-01-01 Male Mdp1 -/- 199 Finished Pipeline DCC 13.7
J13710 2016-01-01 Female C57BL/6NJ 199 Finished Pipeline DCC 15.3
J13711 2016-01-01 Female C57BL/6NJ 199 Finished Pipeline DCC 18.8
J13715 2016-01-01 Male C57BL/6NJ 199 Finished Pipeline DCC 26.1
J13716 2016-01-01 Male C57BL/6NJ 199 Finished Pipeline DCC 11.9
J13712 2016-01-01 Female C57BL/6NJ 199 Finished Pipeline DCC 15.2
J13717 2016-01-01 Male C57BL/6NJ 199 Finished Pipeline DCC 15.2
J13713 2016-01-01 Female C57BL/6NJ 199 Finished Pipeline DCC 23.7
J13718 2016-01-01 Male C57BL/6NJ 199 Finished Pipeline DCC 7.9
J13714 2016-01-01 Female C57BL/6NJ 199 Finished Pipeline DCC 16.0
J13719 2016-01-01 Male C57BL/6NJ 199 Finished Pipeline DCC 13.7
J13696 2016-01-01 Female C57BL/6NJ 199 Finished Pipeline DCC 37.8
J13697 2016-01-01 Female C57BL/6NJ 199 Finished Pipeline DCC 20.3
J13701 2016-01-01 Male C57BL/6NJ 199 Finished Pipeline DCC -4.7
J13702 2016-01-01 Male C57BL/6NJ 199 Finished Pipeline DCC 12.0
J13698 2016-01-01 Female C57BL/6NJ 199 Finished Pipeline DCC 9.1
J13703 2016-01-01 Male C57BL/6NJ 199 Finished Pipeline DCC 15.4
J13699 2016-01-01 Female C57BL/6NJ 199 Finished Pipeline DCC 23.5
J13704 2016-01-01 Male C57BL/6NJ 199 Finished Pipeline DCC 5.4
J13700 2016-01-01 Female C57BL/6NJ 199 Finished Pipeline DCC 17.8
J13705 2016-01-01 Male C57BL/6NJ 199 Finished Pipeline DCC 19.3
J12224 2016-01-01 Male Myorg/2J -/- 199 Finished Pipeline DCC 11.2
J12225 2016-01-01 Male Myorg/2J -/- 199 Finished Pipeline DCC 10.7
J12226 2016-01-01 Male Myorg/2J -/- 199 Finished Pipeline DCC 20.2
J12263 2016-01-01 Female Iqcj -/- 199 Finished Pipeline DCC -0.2
J12193 2016-01-01 Female Cdh4 -/- 199 Finished Pipeline DCC 13.0
J12205 2016-01-01 Female Zfp689 -/- 199 Finished Pipeline DCC 31.2
J12283 2016-01-01 Female Lima1 -/- 199 Finished Pipeline DCC 15.9
J12284 2016-01-01 Female Lima1 -/- 199 Finished Pipeline DCC 15.4
J12287 2016-01-01 Male Lima1 -/- 199 Finished Pipeline DCC 4.1
J12285 2016-01-01 Male Lima1 -/- 199 Finished Pipeline DCC 12.4
J12286 2016-01-01 Male Lima1 -/- 199 Finished Pipeline DCC 23.8
J12120 2016-01-01 Female Tex29 -/- 199 Finished Pipeline DCC -3.7
J12129 2016-01-01 Male Tex29 -/- 199 Finished Pipeline DCC 7.6
J12134 2016-01-01 Female Tex29 -/- 199 Finished Pipeline DCC 3.0
J12136 2016-01-01 Male Tex29 -/- 199 Finished Pipeline DCC 13.7
J12137 2016-01-01 Male Tex29 -/- 199 Finished Pipeline DCC 22.0
J12138 2016-01-01 Male Tex29 -/- 199 Finished Pipeline DCC 17.9
J8828 2016-01-01 Female Parg -/+ 199 Finished Pipeline DCC 13.5
J8829 2016-01-01 Female Parg -/+ 199 Finished Pipeline DCC 15.2
J8864 2016-01-01 Male Parg -/+ 199 Finished Pipeline DCC -3.8
J8865 2016-01-01 Male Parg -/+ 199 Finished Pipeline DCC 3.1
J8830 2016-01-01 Male Parg -/+ 199 Finished Pipeline DCC 10.7
J8866 2016-01-01 Male Parg -/+ 199 Finished Pipeline DCC 4.2
J8831 2016-01-01 Male Parg -/+ 199 Finished Pipeline DCC 13.8
J8833 2016-01-01 Male Parg -/+ 199 Finished Pipeline DCC 17.7
J8859 2016-01-01 Female Parg -/+ 199 Finished Pipeline DCC -9.1
J8861 2016-01-01 Female Parg -/+ 199 Finished Pipeline DCC 25.1
J10959 2016-01-01 Male Kntc1 -/+ 199 Finished Pipeline DCC 11.9
J13590 2016-01-01 Male Adck5 -/- 199 Finished Pipeline DCC 15.1
J13591 2016-01-01 Male Adck5 -/- 199 Finished Pipeline DCC 18.9
J13592 2016-01-01 Male Adck5 -/- 199 Finished Pipeline DCC 1.0
J10391 2016-01-01 Female Tpcn1 -/- 199 Finished Pipeline DCC 16.1
J10396 2016-01-01 Male Tpcn1 -/- 199 Finished Pipeline DCC 28.0
J10984 2016-01-01 Male Srcin1 -/- 199 Found Dead DCC 12.3
J10983 2016-01-01 Male Srcin1 -/+ 199 Finished Pipeline DCC 24.0
J10985 2016-01-01 Male Srcin1 -/+ 199 Finished Pipeline DCC -8.8
J10982 2016-01-01 Female Srcin1 -/+ 199 Finished Pipeline DCC 8.2
J10981 2016-01-01 Female Srcin1 -/+ 199 Finished Pipeline DCC 10.1
J9084 2016-01-01 Female Thra -/+ 199 Finished Pipeline DCC 16.0
J9086 2016-01-01 Female Thra -/+ 199 Finished Pipeline DCC 13.7
J11188 2016-01-01 Female Theg -/+ 199 Finished Pipeline DCC 0.2
J11189 2016-01-01 Female Theg -/+ 199 Finished Pipeline DCC 14.5
J11190 2016-01-01 Female Theg -/+ 199 Finished Pipeline DCC 25.0
J11191 2016-01-01 Male Theg -/+ 199 Finished Pipeline DCC 0.2
J11187 2016-01-01 Female Theg -/- 199 Finished Pipeline DCC 16.7
J11195 2016-01-01 Female Theg -/+ 199 Finished Pipeline DCC 1.0
J11197 2016-01-01 Female Theg -/+ 199 Finished Pipeline DCC 19.7
J9547 2016-01-01 Female Sapcd1 -/+ 199 Finished Pipeline DCC 2.1
J9552 2016-01-01 Male Sapcd1 -/+ 199 Finished Pipeline DCC 22.4
J9550 2016-01-01 Female Sapcd1 -/+ 199 Finished Pipeline DCC 7.2
J10868 2016-01-01 Male Car12/2J -/- 199 Finished Pipeline DCC 14.3
J10925 2016-01-01 Male Car12/2J -/- 199 Finished Pipeline DCC 28.3
J10926 2016-01-01 Male Car12/2J -/- 199 Finished Pipeline DCC 14.8
J8900 2016-01-01 Male Tnfsf18 -/- 199 Finished Pipeline DCC 20.6
J8901 2016-01-01 Male Tnfsf18 -/- 199 Finished Pipeline DCC 34.0
J8897 2016-01-01 Male Tnfsf18 -/- 199 Finished Pipeline DCC 17.7
J8899 2016-01-01 Male Tnfsf18 -/- 199 Finished Pipeline DCC -3.0
J8884 2016-01-01 Male Tnfsf18 -/- 199 Finished Pipeline DCC 26.9
J8965 2016-01-01 Female Nrsn1 -/- 199 Finished Pipeline DCC 33.6
J8969 2016-01-01 Male Nrsn1 -/- 199 Finished Pipeline DCC -1.4
J8966 2016-01-01 Female Nrsn1 -/- 199 Finished Pipeline DCC 18.7
J8978 2016-01-01 Female Nrsn1 -/- 199 Finished Pipeline DCC 9.3
J10512 2016-01-01 Female Snx3 -/+ 199 Finished Pipeline DCC 8.3
J10513 2016-01-01 Female Snx3 -/+ 199 Finished Pipeline DCC 20.2
J10516 2016-01-01 Male Snx3 -/+ 199 Finished Pipeline DCC 7.3
J10518 2016-01-01 Male Snx3 -/+ 199 Finished Pipeline DCC -1.9
J10519 2016-01-01 Male Snx3 -/+ 199 Finished Pipeline DCC 21.0
J10521 2016-01-01 Female Snx3 -/+ 199 Finished Pipeline DCC 21.4
J10522 2016-01-01 Female Snx3 -/+ 199 Finished Pipeline DCC 7.7
J10523 2016-01-01 Male Snx3 -/+ 199 Finished Pipeline DCC 26.2
J12945 2016-01-01 Male Sprr3 -/- 199 Finished Pipeline DCC 17.0
J4778 2015-12-24 Male Oard1 -/- 199 Found Dead DCC 12.7
J7434 2015-12-24 Female Oard1 -/- 199 Finished Pipeline DCC 18.0
J7448 2015-12-24 Female Oard1 -/- 199 Finished Pipeline DCC 20.6
J7452 2015-12-24 Male Oard1 -/- 199 Finished Pipeline DCC 6.5
J7453 2015-12-24 Male Oard1 -/- 199 Finished Pipeline DCC 29.9
J7455 2015-12-24 Female Oard1 -/- 199 Finished Pipeline DCC 17.3
J7456 2015-12-24 Female Oard1 -/- 199 Finished Pipeline DCC 31.6
J7460 2015-12-24 Male Oard1 -/- 199 Finished Pipeline DCC 1.2
J7458 2015-12-24 Female Oard1 -/- 199 Finished Pipeline DCC -10.7
J7466 2015-12-24 Male Oard1 -/- 199 Finished Pipeline DCC 19.4
J7467 2015-12-24 Male Oard1 -/- 199 Finished Pipeline DCC 3.3
J9660 2015-12-24 Female Tssk5 -/- 199 Finished Pipeline DCC -3.3
J9664 2015-12-24 Female Tssk5 -/- 199 Finished Pipeline DCC 6.4
J9661 2015-12-24 Female Tssk5 -/- 199 Finished Pipeline DCC 7.5
J9662 2015-12-24 Female Tssk5 -/- 199 Finished Pipeline DCC 0.0
J9663 2015-12-24 Female Tssk5 -/- 199 Finished Pipeline DCC 0.2
J7069 2015-12-24 Female Paqr7 -/- 199 Finished Pipeline DCC 0.2
J7073 2015-12-24 Female Paqr7 -/- 199 Finished Pipeline DCC 1.2
J7075 2015-12-24 Female Paqr7 -/- 199 Finished Pipeline DCC 18.8
J7076 2015-12-24 Female Paqr7 -/- 199 Finished Pipeline DCC 6.8
J7080 2015-12-24 Male Paqr7 -/- 199 Finished Pipeline DCC 3.4
J7081 2015-12-24 Male Paqr7 -/- 199 Finished Pipeline DCC -3.6
J7083 2015-12-24 Male Paqr7 -/- 199 Finished Pipeline DCC 15.8
J7088 2015-12-24 Male Paqr7 -/- 199 Finished Pipeline DCC 32.3
J10118 2015-12-24 Male Arf2 -/- 199 Other DCC 5.0
J10119 2015-12-24 Male Arf2 -/- 199 Finished Pipeline DCC 19.4
J12294 2015-12-24 Female C57BL/6NJ 199 Finished Pipeline DCC 26.0
J12295 2015-12-24 Female C57BL/6NJ 199 Finished Pipeline DCC 14.9
J12299 2015-12-24 Male C57BL/6NJ 199 Finished Pipeline DCC 6.9
J12300 2015-12-24 Male C57BL/6NJ 199 Sick DCC 7.7
J12296 2015-12-24 Female C57BL/6NJ 199 Finished Pipeline DCC 20.8
J12297 2015-12-24 Female C57BL/6NJ 199 Finished Pipeline DCC 12.1
J12302 2015-12-24 Male C57BL/6NJ 199 Finished Pipeline DCC 5.4
J12298 2015-12-24 Female C57BL/6NJ 199 Finished Pipeline DCC 7.3
J12303 2015-12-24 Male C57BL/6NJ 199 Finished Pipeline DCC 25.5
J10120 2015-12-24 Female Rab20 -/- 199 Finished Pipeline DCC -1.3
J10121 2015-12-24 Female Rab20 -/- 199 Finished Pipeline DCC 29.4
J10122 2015-12-24 Female Rab20 -/- 199 Finished Pipeline DCC 15.4
J10106 2015-12-24 Female Bmp2k -/- 199 Finished Pipeline DCC 15.2
J9153 2015-12-24 Female Mepce -/+ 199 Finished Pipeline DCC 13.2
J9154 2015-12-24 Female Mepce -/+ 199 Finished Pipeline DCC 12.6
J9157 2015-12-24 Male Mepce -/+ 199 Finished Pipeline DCC 7.8
J9159 2015-12-24 Male Mepce -/+ 199 Finished Pipeline DCC 7.2
J9136 2015-12-24 Female Mepce -/+ 199 Finished Pipeline DCC 1.2
J9142 2015-12-24 Male Mepce -/+ 199 Finished Pipeline DCC 2.7
J9131 2015-12-24 Female Mepce -/+ 199 Finished Pipeline DCC -0.3
J9139 2015-12-24 Male Mepce -/+ 199 Finished Pipeline DCC -9.0
J9133 2015-12-24 Female Mepce -/+ 199 Finished Pipeline DCC 22.9
J9134 2015-12-24 Female Mepce -/+ 199 Finished Pipeline DCC 34.4
J9140 2015-12-24 Male Mepce -/+ 199 Finished Pipeline DCC -2.8
J9141 2015-12-24 Male Mepce -/+ 199 Finished Pipeline DCC -2.7
J9137 2015-12-24 Female Mepce -/+ 199 Finished Pipeline DCC 16.5
J9138 2015-12-24 Female Mepce -/+ 199 Finished Pipeline DCC 31.4
J9143 2015-12-24 Male Mepce -/+ 199 Finished Pipeline DCC 9.4
J9144 2015-12-24 Male Mepce -/+ 199 Finished Pipeline DCC 14.9
J9355 2015-12-24 Female Nek2/2J -/- 199 Finished Pipeline DCC 0.5
J11634 2015-12-24 Female C57BL/6NJ 199 Finished Pipeline DCC 24.1
J11635 2015-12-24 Female C57BL/6NJ 199 Finished Pipeline DCC 11.6
J11639 2015-12-24 Male C57BL/6NJ 199 Finished Pipeline DCC 15.1
J11640 2015-12-24 Male C57BL/6NJ 199 Finished Pipeline DCC 5.3
J11636 2015-12-24 Female C57BL/6NJ 199 Finished Pipeline DCC 16.2
J11641 2015-12-24 Male C57BL/6NJ 199 Finished Pipeline DCC -10.9
J11637 2015-12-24 Female C57BL/6NJ 199 Finished Pipeline DCC 20.6
J11642 2015-12-24 Male C57BL/6NJ 199 Finished Pipeline DCC 3.2
J11638 2015-12-24 Female C57BL/6NJ 199 Finished Pipeline DCC 25.6
J11643 2015-12-24 Male C57BL/6NJ 199 Finished Pipeline DCC 19.7